|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2024 Measured TD: 10880 ft. Vertical TD: 6502 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/13/2013 | Prop Depth/Form: | 7199 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: All | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1400 ft. | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | Cement: | Sacks: 839, Top: 5725 ft., Bottom: 7199 ft. |
| | |
Wellbore Completed | Completion Date: | 4/28/2012 | Spud Date: | 4/16/2012 | Spud Date Is: | ACTUAL | Measured TD: | 10880 ft. | Measured PB depth: | 10860 ft. | True Vertical TD: | 6502 ft. | True Vertical PB depth: | 6502 ft. | Top PZ Location: | Sec:14 Twp: 8N 61W | Footage: 650 FNL 654 FWL | Depth | Bottom Hole Location: | Sec:14 Twp: 8N 61W | Footage: 651 FSL 670 FWL | Depth | Log Types: | CBL AND GR | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 70 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 6, Top: 0 ft., Bottom: 70 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 12 in., Size: 9.625 in., Top: 0 ft., Depth: 1450 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 555, Top: 0 ft., Bottom: 1450 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6665 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 850 ft., Bottom: 6665 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5893 ft., Depth: 10880 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 6338 ft. | 6415 ft. | Y | | NIOBRARA | 6415 ft. | | Y | |
Formation NBRR Formation Classification: OW Status: SI - 6/1/2024 Interval Top: 7002 ft. Interval Bottom: 10768 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/21/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 5/7/2012 | Treatment Summary: | Preformed 16 stage Frac with 3,142,350 20/40 sand, 189,642 RC sand and 54,849 total fluid |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6130 ft. | Tubing Packer Depth: | 6123 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/21/2012 | Test Method: | | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 920 | BBLS_OIL | 635 | BTU_GAS | 1382 | CALC_BBLS_H2O | 920 | CALC_BBLS_OIL | 635 | CALC_GOR | 420 | CALC_MCF_GAS | 267 | CASING_PRESS | 210 | GRAVITY_OIL | 37 | MCF_GAS | 267 | TUBING_PRESS | 2300 |
| Perforation Data: | Interval Top: | 7002 ft. | # Of Holes: | 16 | Interval Bottom: | 10768 ft. | Hole Size: | 4.5 in. |
|
Sidetrack #01 Wellbore Classification: Status: AB - 8/13/2012 Measured TD: Wellbore Data for Sidetrack #01 | Wellbore Classification: AB - 8/13/2012 | Wellbore Permit | | Permit #: | | Expiration Date: | 9/13/2013 | Prop Depth/Form: | 10853 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: ALL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1400 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6825 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 654, Top: 1400 ft., Bottom: 6825 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 5825 ft., Depth: 10855 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 353, Top: 5825 ft., Bottom: 10855 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Measured TD: | | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:14 Twp: 8N 61W | Footage: 687 FNL 650 FWL | Depth | Bottom Hole Location: | Sec:14 Twp: 8N 61W | Footage: 650 FSL 650 FWL | Depth | No formation data to display. |
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 1 |
Total Gas Produced (MCF) | 3 |
GOR | 3000 |
GOR Determination | BOE |
Average BOE per Day | 0.005 |
Average MCFE per Day | 0.024 |
Federal Financial Assurance | i | |
|
|