Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34347
Well Classification: GW Status: PA - 11/13/2023
Well Name/No:ARISTOCRAT ANGUS #0-8-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/13/2023
FacilityID:425327LocationID:333137
County:WELD #123Location:SWSW 3 3N65W 6
Field:WATTENBERG - #90750Elevation:4806 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:523FSL  793 FWLLat/Long: 40.248530 / -104.656010Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.248557 / -104.656003Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/18/2013
End Date: 7/18/2013
Reported: 9/17/2013
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/13/2023             Measured TD: 7860 ft.    Vertical TD: 7756 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/13/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/11/2013
Proposed Top PZ Location:Sec:3 Twp: 3N 65W Footage: 27 FSL  43 FWL
Bottom Hole Location:Sec:3 Twp: 3N 65W Footage: 23 FSL  48 FWL
Proposed Depth/Form:7407 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 219, Top: 0 ft., Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7834 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 220, Top: 6700 ft., Bottom: 7834 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4785 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4185 ft., Bottom: 4785 ft.

Wellbore Completed
Completion Date:5/22/2013
Spud Date:5/18/2013Spud Date Is:ACTUAL
Measured TD:7860 ft.Measured PB depth:7824 ft.
True Vertical TD:7756 ft.True Vertical PB depth:7720 ft.
Top PZ Location:Sec:3 Twp: 3N 65WFootage: 27 FSL  43 FWL
Bottom Hole Location:Sec:3 Twp: 3N 65WFootage: 23 FSL  48 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 756 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 756 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7849 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 605, Top: 3170 ft., Bottom: 7860 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4431 ft.
NIOBRARA6971 ft.
CODELL7248 ft.
J SAND7707 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 11/13/2023                Interval Top: 7728 ft.    Interval Bottom: 7763 ft.

 Completed Information for Formation J SAND
1st Production Date:8/2/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/18/2013Treatment End Date:7/18/2013
Treatment Summary:Frac'd the J Sand with 152,520# 30/50 and 160,229 gals SLF.
Total fluid used in treatment (bbls):3815Max pressure during treatment (psi):5056
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):3815Total flowback volume recovered (bbls):262
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):152520Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7728 ft.# Of Holes:75
Interval Bottom:7763 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/13/2013                Interval Top: 7249 ft.    Interval Bottom: 7265 ft.

 Completed Information for Formation CODELL
1st Production Date:8/2/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/18/2013Treatment End Date:7/18/2013
Treatment Summary:Set CFP @ 7310'. 07-18-13 Frac'd the Codell with 149,580# 30/50 and 141,114 gals SLF. 07-18-13
Total fluid used in treatment (bbls):3359Max pressure during treatment (psi):6192
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):3359Total flowback volume recovered (bbls):262
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):149580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7249 ft.# Of Holes:48
Interval Bottom:7265 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/9/2013                  Interval Top: 6976 ft.    Interval Bottom: 7763 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/2/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/9/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 6870'. 07-22-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 07-23-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7673 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 54
BBLS_OIL 31
BTU_GAS 1260
CALC_BBLS_H2O 54
CALC_BBLS_OIL 31
CALC_GOR 20645
CALC_MCF_GAS 640
CASING_PRESS 1310
GRAVITY_OIL 60
MCF_GAS 640
TUBING_PRESS 905
Perforation Data:
Interval Top:6976 ft.# Of Holes:227
Interval Bottom:7763 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/13/2023                Interval Top: 6976 ft.    Interval Bottom: 7265 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/2/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6976 ft.# Of Holes:152
Interval Bottom:7265 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/13/2013                Interval Top: 6976 ft.    Interval Bottom: 7045 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/2/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/18/2013Treatment End Date:7/18/2013
Treatment Summary:Set CFP @ 7100'. 07-18-13 Frac'd the Niobrara with 100,660# 30/50 and 122,764 gals SLF. 07-18-13
Total fluid used in treatment (bbls):2923Max pressure during treatment (psi):6150
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):2923Total flowback volume recovered (bbls):262
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):100660Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6976 ft.# Of Holes:104
Interval Bottom:7045 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/13/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No