|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/23/2019 Measured TD: 7743 ft. Vertical TD: 7331 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/23/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/6/2013 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 1320 FNL 1320 FEL | | Bottom Hole Location: | Sec:25 Twp: 2N 65W | Footage: 1320 FNL 1320 FEL | | Proposed Depth/Form: | 8137 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 940 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 940 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8137 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 789, Top: , Bottom: 8137 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/18/2011 | | Spud Date: | 11/11/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7743 ft. | Measured PB depth: | 7688 ft. | | True Vertical TD: | 7331 ft. | True Vertical PB depth: | 7276 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 1323 FNL 1307 FEL | | Bottom Hole Location: | Sec:25 Twp: 2N 65W | Footage: 1322 FNL 1309 FEL | | Log Types: | CBL, Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1009 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1009 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7733 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 1914 ft., Bottom: 7733 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7251 ft. | | | | | FORT HAYS | 7539 ft. | | | | | CODELL | 7563 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/16/2012 Interval Top: 7566 ft. Interval Bottom: 7578 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/18/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7566 ft. | # Of Holes: | 48 | | Interval Bottom: | 7578 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/23/2019 Interval Top: 7328 ft. Interval Bottom: 7578 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.428571 in. | Tubing Setting Depth: | 7546 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/21/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 100 | | BTU_GAS | 1280 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 320 | | GRAVITY_OIL | 47 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7328 ft. | # Of Holes: | 96 | | Interval Bottom: | 7578 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 10/16/2012 Interval Top: 7328 ft. Interval Bottom: 7438 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7328 ft. | # Of Holes: | 48 | | Interval Bottom: | 7438 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/23/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|