Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34274
Well Classification: OW Status: PA - 4/7/2023
Well Name/No:Herrell #1-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/7/2023
FacilityID:425124LocationID:425135
County:WELD #123Location:NENE 22 7N66W 6
Field:WATTENBERG - #90750Elevation:4909 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:702FNL  718 FELLat/Long: 40.566040 / -104.756802Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.566127 / -104.756826Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/4/2013
End Date: 1/4/2013
Reported: 6/26/2013
Days to report: 173
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/7/2023             Measured TD: 7660 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/7/2023
Wellbore Permit
Permit #: Expiration Date:8/30/2013
Proposed Depth/Form:7660 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E/2 NE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 80, Drill Unit: E/2 NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.875 in., Top: 0 ft., Depth: 840 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 588, Top: 0 ft., Bottom: 840 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7660 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 808, Top: 0 ft., Bottom: 7660 ft.

Wellbore Completed
Completion Date:11/11/2011
Spud Date:11/6/2011Spud Date Is:ACTUAL
Measured TD:7660 ft.Measured PB depth:7635 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Density, Neutron, Induction, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 856 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 856 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7653 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 1357 ft., Bottom: 7653 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3850 ft.
SUSSEX4500 ft.
SHANNON5043 ft.
NIOBRARA7134 ft.
FORT HAYS7421 ft.
CODELL7443 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/9/2023                  Interval Top: 7444 ft.    Interval Bottom: 7457 ft.

 Completed Information for Formation CODELL
1st Production Date:5/17/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/30/2011
Treatment Summary:273,850 gals, (176,856 gals SLF), 180,160 lbs 30/50 White
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 99
BTU_GAS 1224
CALC_BBLS_H2O 4
CALC_BBLS_OIL 198
CALC_GOR 797
CALC_MCF_GAS 158
CASING_PRESS 1900
GRAVITY_OIL 42
MCF_GAS 79
Perforation Data:
Interval Top:7444 ft.# Of Holes:52
Interval Bottom:7457 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/7/2023                  Interval Top: 6947 ft.    Interval Bottom: 7457 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/5/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6947 ft.# Of Holes:332
Interval Bottom:7457 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/9/2023                  Interval Top: 6947 ft.    Interval Bottom: 7358 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/8/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/4/2013Treatment End Date:1/4/2013
Treatment Summary:NBRR A- 188,748 gals(110,838 gals SLF),100,140 lbs 30/50 White NBRR B- 277,410 gals(202,776 gals SLF), 180,060 lbs 30/50 White NBRR C- 191,478 gals(114,366 gals SLF),100,000 lbs 30/50 White
Total fluid used in treatment (bbls):15658Max pressure during treatment (psi):5883
Total gas used in treatment (mcf):0Fluid density (lbs/gal):0.25
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):12795
Fresh water used in treatment (bbls):15658Disposition method For flowback:DISPOSAL
Total proppant used (lbs):380200Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 37
BTU_GAS 1328
CALC_BBLS_H2O 12
CALC_BBLS_OIL 74
CALC_GOR 351
CALC_MCF_GAS 26
CASING_PRESS 400
GRAVITY_OIL 42
MCF_GAS 13
Perforation Data:
Interval Top:6947 ft.# Of Holes:280
Interval Bottom:7358 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/07/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No