|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/14/2022 Measured TD: 8326 ft. Vertical TD: 8171 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/14/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/15/2013 | | Proposed Top PZ Location: | Sec:30 Twp: 2N 67W | Footage: 628 FNL 2006 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 67W | Footage: 622 FNL 2005 FEL | | Proposed Depth/Form: | 8385 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE/4 |
| | |
| Wellbore Completed | | Completion Date: | 6/10/2012 | | Spud Date: | 6/6/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8326 ft. | Measured PB depth: | 8309 ft. | | True Vertical TD: | 8171 ft. | True Vertical PB depth: | 8154 ft. | | Top PZ Location: | Sec:30 Twp: 2N 67W | Footage: 628 FNL 2006 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 67W | Footage: 622 FNL 2005 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; P/E IAIT-CNLD-TC-CPHCAL-MLMCFL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 876 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 876 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8324 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 44, Top: 8100 ft., Bottom: 8324 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8075 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 2144 ft., Bottom: 8075 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4163 ft. | | | | | SUSSEX | 4609 ft. | | | | | SHANNON | 5121 ft. | | | | | NIOBRARA | 7461 ft. | | | | | FORT HAYS | 7726 ft. | | | | | CODELL | 7749 ft. | | | | | J SAND | 8175 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/10/2012 Interval Top: 7750 ft. Interval Bottom: 7770 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/26/2012 | Treatment End Date: | 7/26/2012 | | Treatment Summary: | PERF CODL 7750-7770 HOLES 60 SIZE .38
Frac CODL down 4.5" casing w/ 213,402 gal slickwater w/ 150,280# 40/70, 4,000# 20/40.
Broke @ 2,699 psi @ 2.9 bpm. ATP=4,125 psi; MTP=5,321 psi; ATR=60.2 bpm; ISDP=2,728 psi
| | Total fluid used in treatment (bbls): | 5081 | Max pressure during treatment (psi): | 5321 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154280 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7750 ft. | # Of Holes: | 60 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/14/2022 Interval Top: 7534 ft. Interval Bottom: 7770 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/14/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 35 | | BTU_GAS | 1169 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 2127 | | CALC_MCF_GAS | 74 | | CASING_PRESS | 1107 | | GRAVITY_OIL | 48 | | MCF_GAS | 74 |
| | Perforation Data: | | Interval Top: | 7534 ft. | # Of Holes: | 122 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/10/2012 Interval Top: 7534 ft. Interval Bottom: 7662 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/26/2012 | Treatment End Date: | 7/26/2012 | | Treatment Summary: | PERF NBRR 7534-7662 HOLES 62 SIZE .42
Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 231,588 gal slickwater w/ 200,340# 40/70, 4,000# 20/40.
Broke @ 3,041 psi @ 3.4 bpm. ATP=4,434 psi; MTP=5,338 psi; ATR=60.4 bpm; ISDP=2,826 psi
| | Total fluid used in treatment (bbls): | 5514 | Max pressure during treatment (psi): | 5338 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204340 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7534 ft. | # Of Holes: | 62 | | Interval Bottom: | 7662 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/14/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|