Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34153
Well Classification: OW Status: PA - 4/1/2025
Well Name/No:OVERLOOK #7-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/1/2025
FacilityID:424727LocationID:311278
Municipality/County:FIRESTONE / WELD #123Location:NENE 30 2N67W 6
Field:WATTENBERG - #90750Elevation:5012 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:701FNL  643 FELLat/Long: 40.114779 / -104.926083Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.114779 / -104.926079Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/19/2012
End Date: 7/19/2012
Reported: 7/31/2012
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/1/2025             Measured TD: 8067 ft.    Vertical TD: 7790 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/15/2013
Proposed Top PZ Location:Sec:30 Twp: 2N 67W Footage: 2130 FNL  2130 FEL
Bottom Hole Location:Sec:30 Twp: 2N 67W Footage: 2130 FNL  2130 FEL
Proposed Depth/Form:8122 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24.0 , Citings Type: PLANNED
Cement:Sacks: 595, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8515 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8515 ft.

Wellbore Completed
Completion Date:5/31/2012
Spud Date:5/26/2012Spud Date Is:ACTUAL
Measured TD:8067 ft.Measured PB depth:8010 ft.
True Vertical TD:7790 ft.True Vertical PB depth:7733 ft.
Top PZ Location:Sec:30 Twp: 2N 67WFootage: 1784 FNL  2124 FEL
Bottom Hole Location:Sec:30 Twp: 2N 67WFootage: 1800 FNL  2133 FEL
Log Types:PRE FORM 5
Log Types:CBL; NO OPEN HOLE LOGS
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 886 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 886 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8056 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1018, Top: 444 ft., Bottom: 8056 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4200 ft.
SHANNON4225 ft.
SUSSEX4504 ft.
NIOBRARA7585 ft.
CODELL7856 ft.
FORT HAYS7856 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/2/2025                  Interval Top: 7856 ft.    Interval Bottom: 7876 ft.

 Completed Information for Formation CODELL
1st Production Date:9/5/2012Choke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/19/2012Treatment End Date:7/19/2012
Treatment Summary:PERF CODL 7856-7876 HOLES 60 SIZE .38 Frac CODL down 4.5" casing w/ 207,858 gal slickwater w/ 151,680# 40/70, 4,000# 20/40. Broke @ 1,953 psi @ 1.5 bpm. ATP=4,018 psi; MTP=4,792 psi; ATR=59.7 bpm; ISDP=2,666 psi
Total fluid used in treatment (bbls):3611Max pressure during treatment (psi):4792
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):155680Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7856 ft.# Of Holes:60
Interval Bottom:7876 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/2/2025                  Interval Top: 7648 ft.    Interval Bottom: 7876 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/1/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 50
BTU_GAS 1169
CALC_BBLS_OIL 50
CALC_GOR 2803
CALC_MCF_GAS 140
CASING_PRESS 1688
GRAVITY_OIL 48
MCF_GAS 140
Perforation Data:
Interval Top:7648 ft.# Of Holes:112
Interval Bottom:7876 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/2/2025                  Interval Top: 7648 ft.    Interval Bottom: 7769 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/4/2012Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/19/2012Treatment End Date:7/19/2012
Treatment Summary:PERF NBRR 7648-7769 HOLES 52 SIZE .42 Frac NBRR down 4.5" casing w/ 252 gal 15% HCl & 249,816 gal slickwater w/ 200,340# 40/70, 4,000# 20/40. Broke @ 2,955 psi @ 7.5 bpm. ATP=4,741 psi; MTP=5,397 psi; ATR=59.0 bpm; ISDP=2,883 psi
Total fluid used in treatment (bbls):5948Max pressure during treatment (psi):5397
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):5Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):204340Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7648 ft.# Of Holes:52
Interval Bottom:7769 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/01/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)55
GOR
GOR DeterminationMCFE
Average BOE per Day0.024
Average MCFE per Day0.148

 Federal Financial Assurance  i 

 Tribal Well  i No