|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/14/2025 Measured TD: 8537 ft. Vertical TD: 8184 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/14/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/15/2013 | | Proposed Top PZ Location: | Sec:30 Twp: 2N 67W | Footage: 1320 FNL 2580 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 67W | Footage: 1320 FNL 2580 FEL | | Proposed Depth/Form: | 8505 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8505 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8505 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2012 | | Spud Date: | 5/31/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8537 ft. | Measured PB depth: | 8480 ft. | | True Vertical TD: | 8184 ft. | True Vertical PB depth: | 8127 ft. | | Top PZ Location: | Sec:30 Twp: 2N 67W | Footage: 1299 FNL 2592 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 67W | Footage: 1293 FNL 2595 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; P/E CCV-CNLD-TC-ML-AILC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 893 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 893 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8527 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 49, Top: 8306 ft., Bottom: 8527 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8224 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1022, Top: 486 ft., Bottom: 8226 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4270 ft. | | | | | SUSSEX | 4678 ft. | | | | | SHANNON | 5268 ft. | | | | | NIOBRARA | 7660 ft. | | | | | FORT HAYS | 7928 ft. | | | | | CODELL | 7947 ft. | | | | | J SAND | 8382 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/5/2012 Interval Top: 7950 ft. Interval Bottom: 7970 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/23/2012 | Treatment End Date: | 7/23/2012 | | Treatment Summary: | PERF CODL 7950-7970 HOLES 60 SIZE .38
Frac CODL down 4.5" casing w/ 210,172 gal slickwater w/ 150,080# 40/70, 4,000# 20/40.
Broke @ 4,550 psi @ 6.1 bpm. ATP=4,126 psi; MTP=4,867 psi; ATR=59.7 bpm; ISDP=2,679 psi | | Total fluid used in treatment (bbls): | 5004 | Max pressure during treatment (psi): | 4867 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154080 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7950 ft. | # Of Holes: | 60 | | Interval Bottom: | 7970 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/14/2025 Interval Top: 7734 ft. Interval Bottom: 7970 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/7/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 50 | | BTU_GAS | 1169 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 3060 | | CALC_MCF_GAS | 153 | | CASING_PRESS | 1058 | | GRAVITY_OIL | 48 | | MCF_GAS | 153 |
| | Perforation Data: | | Interval Top: | 7734 ft. | # Of Holes: | 116 | | Interval Bottom: | 7970 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/5/2012 Interval Top: 7734 ft. Interval Bottom: 7864 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/23/2012 | Treatment End Date: | 7/23/2012 | | Treatment Summary: | PERF NBRR 7734-7864 HOLES 56 SIZE .42
Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 250,488 gal slickwater w/ 200,400# 40/70, 4,000# 20/40.
Broke @ 2,701 psi @ 2.2 bpm. ATP=4,715 psi; MTP=5,312 psi; ATR=61.5 bpm; ISDP=2,890 psi
| | Total fluid used in treatment (bbls): | 5964 | Max pressure during treatment (psi): | 5312 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204400 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7734 ft. | # Of Holes: | 56 | | Interval Bottom: | 7864 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/14/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 05/22/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 137 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.065 |
| Average MCFE per Day | 0.368 |
| Federal Financial Assurance | i | |
|
|