|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/30/2024 Measured TD: 8237 ft. Vertical TD: 8075 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/30/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/27/2013 | Proposed Top PZ Location: | Sec:1 Twp: 1N 67W | Footage: 2590 FSL 1320 FEL | Bottom Hole Location: | Sec:1 Twp: 1N 67W | Footage: 2590 FSL 1320 FEL | Proposed Depth/Form: | 8223 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8223 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8223 ft. |
| | |
Wellbore Completed | Completion Date: | 11/22/2011 | Spud Date: | 11/18/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8237 ft. | Measured PB depth: | 8197 ft. | True Vertical TD: | 8075 ft. | True Vertical PB depth: | 8035 ft. | Top PZ Location: | Sec:1 Twp: 1N 67W | Footage: 2605 FSL 1330 FEL | Bottom Hole Location: | Sec:1 Twp: 1N 67W | Footage: 2603 FSL 1331 FEL | Log Types: | CBL
NO OPEN HOLE LOGS RUN. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 878 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 590, Top: 0 ft., Bottom: 878 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8227 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 44, Top: 7980 ft., Bottom: 8227 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7960 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1005, Top: 280 ft., Bottom: 7960 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7320 ft. | | | | CODELL | 7617 ft. | | | | J SAND | 8081 ft. | | | |
Formation CODL Formation Classification: Status: CM - 5/3/2012 Interval Top: 7636 ft. Interval Bottom: 7654 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/2/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/20/2012 | Treatment Summary: | Frac CODL down casing w/ 181,776 gal slickwater w/ 151,160# 40/70, 4,000# 20/40. Broke @ 3,975 psi @ 4.8 bpm. TP=4,285 psi; MTP=4,467 psi; ATR=61.0 bpm; ISDP=2,857 psi |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7636 ft. | # Of Holes: | 54 | Interval Bottom: | 7654 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/30/2024 Interval Top: 7412 ft. Interval Bottom: 7654 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/2/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/3/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 50 | BTU_GAS | 1161 | CALC_BBLS_OIL | 50 | CALC_GOR | 2000 | CALC_MCF_GAS | 100 | CASING_PRESS | 1540 | GRAVITY_OIL | 47 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7412 ft. | # Of Holes: | 126 | Interval Bottom: | 7654 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 5/3/2012 Interval Top: 7412 ft. Interval Bottom: 7505 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/2/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/20/2012 | Treatment Summary: | Frac NBRR down casing w/ 252 gal 15% HCl & 240,534 gal slickwater w/ 201,500# 40/70, 4,000# 20/40. Break not observed. ATP=4,657 psi; MTP=5,123 psi; ATR=61.2 bpm; ISDP=2,930 psi |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7412 ft. | # Of Holes: | 72 | Interval Bottom: | 7505 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/30/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|