|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2023 Measured TD: 12440 ft. Vertical TD: 7805 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/26/2013 | Proposed Top PZ Location: | Sec:29 Twp: 1N 67W | Footage: 2006 FNL 526 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 67W | Footage: 2180 FSL 510 FEL | Proposed Depth/Form: | 12423 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 360, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8237 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 760, Top: , Bottom: 8237 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 7225 ft., Depth: 12423 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 3/16/2012 | Spud Date: | 2/23/2012 | Spud Date Is: | ACTUAL | Measured TD: | 12440 ft. | Measured PB depth: | 12440 ft. | True Vertical TD: | 7805 ft. | True Vertical PB depth: | 7805 ft. | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 2133 FNL 511 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 67W | Footage: 2173 S 502 E | Log Types: | PRELIMINARY FORM 5 | Log Types: | CBL; TVDL; MPR-CNP | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1148 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 860, Top: 16 ft., Bottom: 1191 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8133 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 777, Top: 350 ft., Bottom: 8143 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7290 ft., Depth: 12425 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 7445 ft. | | | | NIOBRARA | 7462 ft. | | | | FORT HAYS | 7991 ft. | | | | CODELL | 8070 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 1/1/2023 Interval Top: 8190 ft. Interval Bottom: 12356 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/15/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 4/30/2012 | Treatment Summary: | FRAC'D THROUGH AN OPEN HOLE LINER FROM 8190-12356. AVERAGE TREATING PRESSURE 4688, AVERAGE RATE 57.37, TOTAL BBLS OF FLUID 77385, TOTAL SAND WEIGHT 1907158. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7862 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/27/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 532 | BTU_GAS | 1325 | CALC_BBLS_OIL | 532 | CALC_GOR | 1314 | CALC_MCF_GAS | 699 | CASING_PRESS | 1671 | GRAVITY_OIL | 45 | MCF_GAS | 699 | TUBING_PRESS | 1209 |
| Perforation Data: | Interval Top: | 8190 ft. | # Of Holes: | | Interval Bottom: | 12356 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2081 |
Total Gas Produced (MCF) | 59041 |
GOR | 28371 |
GOR Determination | MCFE |
Average BOE per Day | 33.489 |
Average MCFE per Day | 194.258 |
Federal Financial Assurance | i | |
|
|