Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33890
Well Classification: OW Status: TA - 8/1/2024
Well Name/No:NORTH RINN #0-8-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date8/1/2024
FacilityID:424115LocationID:424105
County:WELD #123Location:SWSW 9 2N68W 6
Field:WATTENBERG - #90750Elevation:4866 ft.
Planned Location:1130FSL  1133 FWLLat/Long: 40.149090 / -105.013520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.149103 / -105.013537Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/28/2013
End Date: 8/28/2013
Reported: 10/25/2013
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 8/1/2024             Measured TD: 8232 ft.    Vertical TD: 7975 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 8/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/17/2015
Proposed Top PZ Location:Sec:9 Twp: 2N 68W Footage: 18 FSL  17 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 12 FSL  19 FWL
Proposed Depth/Form:8167 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8167 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 167, Top: 7127 ft., Bottom: 8167 ft.

Wellbore Completed
Completion Date:7/11/2013
Spud Date:6/20/2013Spud Date Is:ACTUAL
Measured TD:8232 ft.Measured PB depth:8166 ft.
True Vertical TD:7975 ft.True Vertical PB depth:7909 ft.
Top PZ Location:Sec:9 Twp: 2N 68WFootage: 18 FSL  17 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68WFootage: 12 S  19 W
Log Types:CBL/(Triple Combo run in API: 123-33895)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 55 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 55 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 799 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 809 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8222 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 3396 ft., Bottom: 8232 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4294 ft.
NIOBRARA7375 ft.
CODELL7646 ft.
J SAND8081 ft.

Formation JSND                     Formation Classification:  OW                     Status:  TA - 8/1/2024                  Interval Top: 8082 ft.    Interval Bottom: 8113 ft.

 Completed Information for Formation J SAND
1st Production Date:6/27/2014Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Stage 1 treated with 4423 bbls of slickwater and 149840 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4423Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.74
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):149840Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8082 ft.# Of Holes:75
Interval Bottom:8113 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7648 ft.    Interval Bottom: 7670 ft.

 Completed Information for Formation CODELL
1st Production Date:6/27/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Stage 2 treated with 4411 bbls of slickwater and 157020 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4411Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):157020Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7648 ft.# Of Holes:66
Interval Bottom:7670 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/3/2014                  Interval Top: 7515 ft.    Interval Bottom: 8113 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/27/2014Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Treated with 13476 bbls of slickwater and 455940 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):13476Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):600
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):455940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8042 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2014Test Method:flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 55
BTU_GAS 1298
CALC_BBLS_H2O 10
CALC_BBLS_OIL 55
CALC_GOR 8255
CALC_MCF_GAS 454
CASING_PRESS 2179
GRAVITY_OIL 50
MCF_GAS 454
TUBING_PRESS 1570
Perforation Data:
Interval Top:7515 ft.# Of Holes:221
Interval Bottom:8113 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 8/1/2024                  Interval Top: 7515 ft.    Interval Bottom: 7670 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/27/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7515 ft.# Of Holes:146
Interval Bottom:7670 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7515 ft.    Interval Bottom: 7535 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/27/2014Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Stage 3 treated with 4642 bbls of slickwater and 149080 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4642Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):149080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7515 ft.# Of Holes:80
Interval Bottom:7535 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY02/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
06/03/2024
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No