Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33886
Well Classification: OW Status: PA - 10/1/2024
Well Name/No:NORTH RINN #2-4-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/1/2024
FacilityID:424109LocationID:424105
County:WELD #123Location:SWSW 9 2N68W 6
Field:WATTENBERG - #90750Elevation:4866 ft.
Planned Location:1180FSL  1133 FWLLat/Long: 40.149230 / -105.013520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.149245 / -105.013533Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/2/2013
End Date: 9/2/2013
Reported: 10/30/2013
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/1/2024             Measured TD: 8198 ft.    Vertical TD: 7998 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/17/2015
Proposed Top PZ Location:Sec:9 Twp: 2N 68W Footage: 2560 FSL  1366 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2571 FSL  1375 FWL
Proposed Depth/Form:8151 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8151 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 169, Top: 7101 ft., Bottom: 8151 ft.

Wellbore Completed
Completion Date:8/1/2013
Spud Date:6/24/2013Spud Date Is:ACTUAL
Measured TD:8198 ft.Measured PB depth:8166 ft.
True Vertical TD:7998 ft.True Vertical PB depth:7966 ft.
Top PZ Location:Sec:9 Twp: 2N 68WFootage: 2560 FSL  1366 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68WFootage: 2571 S  1375 W
Log Types:CBL/Triple Combo
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 55 ft., Weight: 62 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 55 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 798 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8188 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 3250 ft., Bottom: 8198 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4071 ft.
NIOBRARA7107 ft.
CODELL7382 ft.
J SAND7828 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/1/2024                 Interval Top: 8010 ft.    Interval Bottom: 8040 ft.

 Completed Information for Formation J SAND
1st Production Date:6/28/2014Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2013Treatment End Date:9/2/2013
Treatment Summary:Stage 1 treated with 4467 bbls of slickwater and 149260 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4467Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):149260Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8010 ft.# Of Holes:75
Interval Bottom:8040 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7584 ft.    Interval Bottom: 7603 ft.

 Completed Information for Formation CODELL
1st Production Date:6/28/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2013Treatment End Date:9/2/2013
Treatment Summary:Stage 2 treated with 4423 bbls of slickwater and 153450 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4423Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):153450Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7584 ft.# Of Holes:57
Interval Bottom:7603 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/5/2014                  Interval Top: 7371 ft.    Interval Bottom: 8040 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/28/2014Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2013Treatment End Date:9/2/2013
Treatment Summary:Treated with 13496 bbls of slickwater and 456240 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):13496Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):700
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):456240Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7992 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2014Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 26
BBLS_OIL 79
BTU_GAS 1298
CALC_BBLS_H2O 26
CALC_BBLS_OIL 79
CALC_GOR 5278
CALC_MCF_GAS 417
CASING_PRESS 1935
GRAVITY_OIL 50
MCF_GAS 417
TUBING_PRESS 1430
Perforation Data:
Interval Top:7371 ft.# Of Holes:208
Interval Bottom:8040 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/1/2024                 Interval Top: 7371 ft.    Interval Bottom: 7603 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/28/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7371 ft.# Of Holes:133
Interval Bottom:7603 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7371 ft.    Interval Bottom: 7390 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/28/2014Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2013Treatment End Date:9/2/2013
Treatment Summary:Stage 3 treated with 4606 bbls of slickwater and 153530 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4606Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):153530Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7371 ft.# Of Holes:76
Interval Bottom:7390 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/01/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No