|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 8721 ft. Vertical TD: 8401 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/23/2013 | | Proposed Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 1300 FNL 64 FEL | | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 1292 FNL 62 FEL | | Proposed Depth/Form: | 8602 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8602 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8602 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/17/2011 | | Spud Date: | 10/12/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8721 ft. | Measured PB depth: | 8663 ft. | | True Vertical TD: | 8401 ft. | True Vertical PB depth: | 8343 ft. | | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 1300 FNL 64 FEL | | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 1292 FNL 62 FEL | | Log Types: | P/E AILC-CNLD-ML; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1259 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 15 ft., Bottom: 1259 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8708 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 8376 ft., Bottom: 8708 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1320 ft., Depth: 8373 ft., Bottom: 8373 ft., Sacks: 1024, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4654 ft. | | | | | SUSSEX | 5080 ft. | 5355 ft. | | | | NIOBRARA | 7737 ft. | | | | | CODELL | 8136 ft. | | | | | J SAND | 8570 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 8586 ft. Interval Bottom: 8610 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/19/2011 | | Treatment Summary: | J S PERF 8586-8610 HOLES 48 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,890 gal Slickwater w/ 116,680# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8586 ft. | # Of Holes: | 48 | | Interval Bottom: | 8610 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/31/2012 Interval Top: 7756 ft. Interval Bottom: 8610 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/19/2011 | | Treatment Summary: | NB PERF 7756-8000 HOLES 62 SIZE 0.42
CD PERF 8138-8160 HOLES 66 SIZE 0.42
J S PERF 8586-8610 HOLES 48 SIZE 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 50 | | BTU_GAS | 1313 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 48 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7756 ft. | # Of Holes: | 176 | | Interval Bottom: | 8610 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7756 ft. Interval Bottom: 8160 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2011 | | Treatment Summary: | NB PERF 7756-8000 HOLES 62 SIZE 0.42 CD PERF 8138-8160 HOLES 66 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 231,252 gal Slickwater w/ 200,720# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 198,870 gal Slickwater w/ 151,229# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7756 ft. | # Of Holes: | 128 | | Interval Bottom: | 8160 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|