|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/20/2021 Measured TD: 7997 ft. Vertical TD: 7773 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/20/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/23/2013 | | Proposed Top PZ Location: | Sec:36 Twp: 2N 65W | Footage: 1970 FNL 1988 FEL | | Bottom Hole Location: | Sec:36 Twp: 2N 65W | Footage: 1973 FNL 1977 FEL | | Proposed Depth/Form: | 7979 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7979 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 766, Top: , Bottom: 7979 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/14/2011 | | Spud Date: | 8/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7997 ft. | Measured PB depth: | 7942 ft. | | True Vertical TD: | 7773 ft. | True Vertical PB depth: | 7718 ft. | | Top PZ Location: | Sec:36 Twp: 2N 65W | Footage: 1970 FNL 1988 FEL | | Bottom Hole Location: | Sec:36 Twp: 2N 65W | Footage: 1973 FNL 1977 FEL | | Log Types: | CBL, Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 985 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 371, Top: 0 ft., Bottom: 985 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7988 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 3415 ft., Bottom: 7988 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1190 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 980 ft., Bottom: 1190 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | | | | | | PARKMAN | 4189 ft. | | | | | SUSSEX | 4742 ft. | | | | | SHANNON | 5364 ft. | | | | | NIOBRARA | 7101 ft. | | | | | FORT HAYS | 7357 ft. | | | | | CODELL | 7381 ft. | | | | | MOWRY | 7840 ft. | | | | | J SAND | 7854 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/29/2021 Interval Top: 7845 ft. Interval Bottom: 7882 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/13/2011 | | Treatment Summary: | Pumped 267,315 lbs of Ottawa Proppant, 16,708 lbs of SB Excel Proppant and 147,168 gallons of Slick Water and Silverstim.
The J-Sand is producing through a composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7845 ft. | # Of Holes: | 88 | | Interval Bottom: | 7882 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/22/2012 Interval Top: 7382 ft. Interval Bottom: 7394 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2011 | | Treatment Summary: | Pumped 246,952 lbs of Ottawa Proppant and 116,592 gallons of 15% HCL, Slick Water and Silverstim.
The Codell is producing through a composite flow through plug.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 48 | | Interval Bottom: | 7394 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/23/2011 Interval Top: 7150 ft. Interval Bottom: 7882 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7818 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/23/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 58 | | BTU_GAS | 1293 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 862 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 240 | | GRAVITY_OIL | 44 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 184 | | Interval Bottom: | 7882 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/29/2021 Interval Top: 7150 ft. Interval Bottom: 7394 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 96 | | Interval Bottom: | 7394 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 10/22/2012 Interval Top: 7150 ft. Interval Bottom: 7249 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2011 | | Treatment Summary: | Pumped 240,404 lbs of Ottawa Proppant and 151,830 gallons of Slick Water and Silverstim.
Commingle the Niobrara and Codell.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 48 | | Interval Bottom: | 7249 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/29/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|