|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/10/2023 Measured TD: 7532 ft. Vertical TD: 7358 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/10/2023 | | Wellbore Permit | Directional | | Permit #: | | Expiration Date: | 5/18/2013 | | Proposed Top PZ Location: | Sec:17 Twp: 6 66 | Footage: 1970 FSL 664 FEL | | Bottom Hole Location: | Sec:17 Twp: 6 66 | Footage: 2014 FSL 691 FEL | | Proposed Depth/Form: | 7350 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 381-5 , Unit Acreage: 80, Drill Unit: E/2 SE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 381-5 , Unit Acreage: 80, Drill Unit: E/2 SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7350 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 6600 ft., Bottom: 7350 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/18/2012 | | Spud Date: | 9/14/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7532 ft. | Measured PB depth: | 7469 ft. | | True Vertical TD: | 7358 ft. | True Vertical PB depth: | 7308 ft. | | Top PZ Location: | Sec:17 Twp: 6 66 | Footage: 1970 FSL 664 FEL | | Bottom Hole Location: | Sec:17 Twp: 6 66 | Footage: 2014 FSL 691 FEL | | Log Types: | HRIC Density Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 732 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 732 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7468 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 1980 ft., Bottom: 7468 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2644 ft. | | | | | PARKMAN | 3671 ft. | | | | | SUSSEX | 4378 ft. | | | | | SHANNON | 4834 ft. | | | | | NIOBRARA | 6945 ft. | | | | | FORT HAYS | 7230 ft. | | | | | CODELL | 7253 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 8/6/2014 Interval Top: 7353 ft. Interval Bottom: 7367 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/20/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/14/2012 | Treatment End Date: | 10/11/2012 | | Treatment Summary: | Total 115,520 lbs 30/50 Ottawa, Pumped 0.5 ppa to 2.0 ppa in 2608 bbls of fluid. Total fluid pumped 4089.3 bbls. | | Total fluid used in treatment (bbls): | 4089 | Max pressure during treatment (psi): | 5413 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 810 | | Fresh water used in treatment (bbls): | 4089 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 115520 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7353 ft. | # Of Holes: | 44 | | Interval Bottom: | 7367 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/8/2019 Interval Top: 7049 ft. Interval Bottom: 7367 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BBLS_OIL | 212 | | BTU_GAS | 1254 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 212 | | CALC_GOR | 566 | | CALC_MCF_GAS | 120 | | CASING_PRESS | 2067 | | GRAVITY_OIL | 49 | | MCF_GAS | 120 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 7049 ft. | # Of Holes: | 74 | | Interval Bottom: | 7367 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/6/2014 Interval Top: 7049 ft. Interval Bottom: 7055 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/20/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/11/2012 | Treatment End Date: | 10/11/2012 | | Treatment Summary: | Total 204,360 lbs 40/70 Ottawa, 4,000 lbs 20/40 SLC Pumped 0.5 ppa to 2.0 ppa in 4224 bbls of fluid. Total fluid pumped 6358.0 bbls. | | Total fluid used in treatment (bbls): | 6358 | Max pressure during treatment (psi): | 5763 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 810 | | Fresh water used in treatment (bbls): | 6358 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204360 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7049 ft. | # Of Holes: | 30 | | Interval Bottom: | 7055 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/10/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/06/2022 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|