|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2020 Measured TD: 7630 ft. Vertical TD: 7388 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/4/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 2N 65W | Footage: 510 FSL 2130 FWL | | Bottom Hole Location: | Sec:16 Twp: 2N 65W | Footage: 510 FSL 2130 FWL | | Proposed Depth/Form: | 7579 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SW/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: S/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7540 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 7540 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/19/2011 | | Spud Date: | 10/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7630 ft. | Measured PB depth: | 7607 ft. | | True Vertical TD: | 7388 ft. | True Vertical PB depth: | 7365 ft. | | Top PZ Location: | Sec:16 Twp: 2N 65W | Footage: 508 FSL 2145 FWL | | Bottom Hole Location: | Sec:16 Twp: 2N 65W | Footage: 516 FSL 2148 FWL | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 946 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 946 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7621 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1032, Top: 520 ft., Bottom: 7621 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4164 ft. | | | | | SUSSEX | 4562 ft. | | | | | NIOBRARA | 7167 ft. | | | | | CODELL | 7449 ft. | | | |
Formation NB-CD Formation Classification: OW Status: SI - 8/1/2020 Interval Top: 7224 ft. Interval Bottom: 7464 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/29/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/17/2011 | | Treatment Summary: | NB PERF 7224-7356 HOLES 60 SIZE 0.42 CD PERF 7450-7464 HOLES 56 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,603 gal Slickwater w/ 101,060# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 193,446 gal Slickwater w/ 76,040# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1251 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 49 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7224 ft. | # Of Holes: | 116 | | Interval Bottom: | 7464 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 07/31/2020 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|