|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2023 Measured TD: 10215 ft. Vertical TD: 6430 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/27/2013 | Proposed Top PZ Location: | Sec:6 Twp: 3 62 | Footage: 1459 FSL 628 FWL | Bottom Hole Location: | Sec:6 Twp: 3 62 | Footage: 512 FNL 1084 FWL | Proposed Depth/Form: | 10324 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | STATE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: ALL | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: | Casing: | String Type: SURF, Hole Size: 16 in., Size: 13.375 in., Top: 0 ft., Depth: 650 ft., Weight: 54.5 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 0 ft., Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 6490 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1290, Top: 0 ft., Bottom: 6490 ft. | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12100 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 750, Top: 5490 ft., Bottom: 12100 ft. |
| | |
Wellbore Completed | Completion Date: | 1/15/2012 | Spud Date: | 12/31/2011 | Spud Date Is: | ACTUAL | Measured TD: | 10215 ft. | Measured PB depth: | | True Vertical TD: | 6430 ft. | True Vertical PB depth: | | Top PZ Location: | Sec:6 Twp: 3 62 | Footage: 1459 FSL 628 FWL | Bottom Hole Location: | Sec:6 Twp: 3 62 | Footage: 512 N 1084 W | Log Types: | Caliper, mudlog-vertical, mudlog-horizontal, triple combination, cement bond log | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 118 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 721 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 232, Top: 0 ft., Bottom: 721 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6933 ft., Weight: 32 , Citings Type: ACTUAL | Cement: | Sacks: 684, Top: 0 ft., Bottom: 6933 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6769 ft., Depth: 10215 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 204, Top: , Bottom: 10215 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3348 ft. | 4042 ft. | N | N | SUSSEX | 4042 ft. | 4977 ft. | N | N | SHANNON | 4977 ft. | 5487 ft. | N | N | PIERRE | 5487 ft. | 6118 ft. | N | N | SHARON SPRINGS | 6118 ft. | | N | N | NIOBRARA | 6257 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: SI - 6/1/2023 Interval Top: 7041 ft. Interval Bottom: 10071 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/18/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2012 | Treatment Summary: | TLTR from Stages 1-13 = 44596.2 bbls. Total sand pumped for all stages = 2,681,397 lbs: 174,271 lbs 40/70 and 2,507,126 lbs 20/40. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | 5550 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CALC_BBLS_H2O | 64 | CALC_BBLS_OIL | 107 | CALC_MCF_GAS | 58 | CASING_PRESS | 110 |
| Perforation Data: | Interval Top: | 7041 ft. | # Of Holes: | 370 | Interval Bottom: | 10071 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 10/10/2024 |
Defined Inactive (SI ) | Y | Defined Inactive 05/31/2023 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|