Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33409
Well Classification: GW Status: PA - 8/2/2018
Well Name/No:PURITAN #6-4-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/2/2018
FacilityID:422846LocationID:336332
Municipality/County:FREDERICK / WELD #123Location:NWSE 34 2N68W 6
Field:WATTENBERG - #90750Elevation:5001 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1997FSL  2093 FELLat/Long: 40.093150 / -104.987370Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.093154 / -104.987364Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/11/2011
End Date: 9/11/2011
Reported: 2/28/2012
Prior to rule 205A.b.(2)(A)
Days to report: 170
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/2/2018             Measured TD: 8435 ft.    Vertical TD: 8306 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/2/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/21/2013
Proposed Top PZ Location:Sec:34 Twp: 2N 68W Footage: 2498 FNL  1365 FEL
Bottom Hole Location:Sec:34 Twp: 2N 68W Footage: 2486 FNL  1358 FEL
Proposed Depth/Form:8364 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8364 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7277 ft., Bottom: 8364 ft.

Wellbore Completed
Completion Date:8/24/2011
Spud Date:8/19/2011Spud Date Is:ACTUAL
Measured TD:8435 ft.Measured PB depth:8401 ft.
True Vertical TD:8306 ft.True Vertical PB depth:8272 ft.
Top PZ Location:Sec:34 Twp: 2N 68WFootage: 2498 FNL  1365 FEL
Bottom Hole Location:Sec:34 Twp: 2N 68WFootage: 2486 FNL  1358 FEL
Log Types:CBL 1670904
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 851 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 851 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8420 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 4480 ft., Bottom: 8420 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4707 ft.
NIOBRARA7535 ft.
CODELL7837 ft.
J SAND8275 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 4/17/2015                 Interval Top: 8284 ft.    Interval Bottom: 8304 ft.

 Completed Information for Formation J SAND
1st Production Date:12/31/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/11/2011
Treatment Summary:J SAND COMPLETION. FRAC'D THE J-SAND 8284'-8304', (40 HOLES) W/69,510 GAL 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,720# 20/40 SAND. 09/11/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8284 ft.# Of Holes:40
Interval Bottom:8304 ft.Hole Size:0.43 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/22/2012                 Interval Top: 7610 ft.    Interval Bottom: 8304 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:12/13/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/22/2012
Treatment Summary:Set CBP @ 7525'. 01-18-12. Drilled out CBP @ 7525', CFP @ 7690', CFP @ 7900' to commingle the JSND-NBRR-CDL. 01-19-12
Tubing Size:2.375 in.Tubing Setting Depth:8248 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/22/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 34
BBLS_OIL 17
BTU_GAS 1246
CALC_BBLS_H2O 34
CALC_BBLS_OIL 17
CALC_GOR 18118
CALC_MCF_GAS 308
CASING_PRESS 1086
GRAVITY_OIL 51
MCF_GAS 308
TUBING_PRESS 516
Perforation Data:
Interval Top:7610 ft.# Of Holes:190
Interval Bottom:8304 ft.Hole Size:0.43 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/2/2018                  Interval Top: 7610 ft.    Interval Bottom: 7858 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/13/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/11/2011
Treatment Summary:CDL-NBRR COMPLETION. SET CFP @ 7900’. 09/11/2011. FRAC’D THE CODELL 7837’-7858’, (42 HOLES) W/91,392 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,180# 30/50 SAND. 09/11/11. SET CFP @ 7690’. 09/11/2011. FRAC’D THE NIOBRARA 7610’-7637’, (108 HOLES) W/104,454 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,180# 30/50 SAND. 09/11/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/14/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 97
BTU_GAS 1246
CALC_BBLS_H2O 23
CALC_BBLS_OIL 97
CALC_GOR 3423
CALC_MCF_GAS 332
CASING_PRESS 1185
GRAVITY_OIL 51
MCF_GAS 332
Perforation Data:
Interval Top:7610 ft.# Of Holes:150
Interval Bottom:7858 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/02/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No