|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/11/2018 Measured TD: 6821 ft. Vertical TD: 6670 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/11/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/16/2013 | | Proposed Top PZ Location: | Sec:33 Twp: 5N 63W | Footage: 653 FSL 672 FEL | | Bottom Hole Location: | Sec:33 Twp: 5N 63W | Footage: 653 FSL 672 FEL | | Proposed Depth/Form: | 6855 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: SESE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 697 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6855 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6005 ft., Bottom: 6855 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/3/2011 | | Spud Date: | 6/28/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 6821 ft. | Measured PB depth: | 6765 ft. | | True Vertical TD: | 6670 ft. | True Vertical PB depth: | 6614 ft. | | Top PZ Location: | Sec:33 Twp: 5N 63W | Footage: 653 FSL 672 FEL | | Bottom Hole Location: | Sec:33 Twp: 5N 63W | Footage: 653 FSL 672 FEL | | Log Types: | CBL, GR, CD, CN, Dl | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 743 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 743 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6792 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 2480 ft., Bottom: 6792 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3295 ft. | | | | | SUSSEX | 3907 ft. | | | | | NIOBRARA | 6243 ft. | | | | | FORT HAYS | 6474 ft. | | | | | CODELL | 6498 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/11/2018 Interval Top: 6398 ft. Interval Bottom: 6661 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/30/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/11/2011 | | Treatment Summary: | CODELL PUMPED 29,778 GAL PAD FLUID AND 106,932 GAL PHASERFRAC W/231,020 LBS 20/40 ROCK/16,000 LBS 20/40 SB EXCEL. ISDP 3334 PSI, ATP 3842 PSI, ATR 22.3 BPM. NBRR PUMPED 19,404 GAL PAD FLUID AND 115,458 GAL PHASERFRAC W/244,680 LBS 20/40 ROCK/16,000 20/40 SB EXCEL. ISDP 3473 PSI; ATP 3917 PSI; ATR 45.2 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/31/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 57 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 40 |
| | Perforation Data: | | Interval Top: | 6398 ft. | # Of Holes: | 88 | | Interval Bottom: | 6661 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/11/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|