|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2021 Measured TD: 8045 ft. Vertical TD: 7928 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 4/5/2013 | Prop Depth/Form: | 8041 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8041 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8041 ft. |
| | |
Wellbore Completed | Completion Date: | 7/25/2011 | Spud Date: | 7/22/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8045 ft. | Measured PB depth: | 8018 ft. | True Vertical TD: | 7928 ft. | True Vertical PB depth: | 7901 ft. | Top PZ Location: | Sec:6 Twp: 2N 65W | Footage: 1322 FNL 2598 FEL | Depth | Bottom Hole Location: | Sec:6 Twp: 2N 65W | Footage: 1318 FNL 2595 FEL | Depth | Log Types: | PRE FORM 5 | Log Types: | P/E RP-TCP-CP-NP; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 837 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 837 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8035 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 235, Top: 6405 ft., Bottom: 8035 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 830 ft., Depth: 5491 ft., Bottom: 5491 ft., Sacks: 670, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 830 ft., Depth: 5500 ft., Bottom: 5503 ft., Sacks: 670, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4176 ft. | | | | SUSSEX | 4601 ft. | 4808 ft. | | | NIOBRARA | 7182 ft. | | | | FORT HAYS | 7443 ft. | | | | CODELL | 7464 ft. | | | | J SAND | 7906 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 7/1/2021 Interval Top: 7924 ft. Interval Bottom: 7956 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | J S PERF 7924-7956 HOLES 60 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,252 gal Slickwater w/ 115,300# 30/50, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7924 ft. | # Of Holes: | 60 | Interval Bottom: | 7956 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/17/2011 Interval Top: 7231 ft. Interval Bottom: 7956 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | NB PERF 7231-7319 HOLES 62 SIZE 0.47
CD PERF 7466-7482 HOLES 64 SIZE 0.42
J S PERF 7924-7956 HOLES 60 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7898 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/17/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 10 | BTU_GAS | 1452 | CALC_BBLS_OIL | 10 | CALC_GOR | 5500 | CALC_MCF_GAS | 55 | CASING_PRESS | 1200 | GRAVITY_OIL | 53 | MCF_GAS | 55 |
| Perforation Data: | Interval Top: | 7231 ft. | # Of Holes: | 186 | Interval Bottom: | 7956 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2021 Interval Top: 7231 ft. Interval Bottom: 7482 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/30/2011 | Treatment Summary: | NB PERF 7231-7319 HOLES 62 SIZE 0.47 CD PERF 7466-7482 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 244,484 gal Slickwater w/ 200,220# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 206,472 gal Slickwater w/ 150,220# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7231 ft. | # Of Holes: | 126 | Interval Bottom: | 7482 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2021 |
Low Producing | Y | Production Period 10/2023 - 09/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|