|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/10/2022 Measured TD: 8335 ft. Vertical TD: 7966 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/10/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 4/5/2013 | Prop Depth/Form: | 8291 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8291 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8291 ft. |
| | |
Wellbore Completed | Completion Date: | 8/1/2011 | Spud Date: | 7/25/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8335 ft. | Measured PB depth: | 3880 ft. | True Vertical TD: | 7966 ft. | True Vertical PB depth: | 3511 ft. | Top PZ Location: | Sec:6 Twp: 2N 65W | Footage: 2481 FNL 2533 FEL | Depth | Bottom Hole Location: | Sec:6 Twp: 2N 65W | Footage: 2481 FNL 2533 FEL | Depth | Log Types: | WELLBORE SIDETRACKED DUE TO CODELL FAULT OUT. CBL, IFLEX/TC, IFLEX/CN/LD, IFLEX/AI/LC, | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 836 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 836 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8326 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 248, Top: 6670 ft., Bottom: 8326 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5682 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 716, Top: 1030 ft., Bottom: 5690 ft., Determination Method: CBL | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: 0 ft., Depth: 8335 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: OPEN HOLE , Top: 3880 ft., Depth: 4790 ft., Bottom: 4790 ft., Sacks: 305, Method: | Additional Cement: | String Type: OPEN HOLE , Top: 7137 ft., Depth: 7790 ft., Bottom: 7790 ft., Sacks: 160, Method: | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PA - 6/10/2022 Measured TD: 8336 ft. Vertical TD: 8111 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PA - 6/10/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/7/2013 | Prop Depth/Form: | 8339 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 836 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 530, Top: 0 ft., Bottom: 836 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8339 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8339 ft. |
| | |
Wellbore Completed | Completion Date: | 8/8/2011 | Spud Date: | 7/25/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8336 ft. | Measured PB depth: | 8294 ft. | True Vertical TD: | 8111 ft. | True Vertical PB depth: | 8069 ft. | Top PZ Location: | Sec:6 Twp: 2N 65W | Footage: 2525 FNL 2351 FEL | Depth | Bottom Hole Location: | Sec:6 Twp: 2N 65W | Footage: 2536 FNL 2336 FEL | Depth | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT @ 870'. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 836 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 836 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8326 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 248, Top: 6673 ft., Bottom: 8326 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7536 ft. | | | | CODELL | 7726 ft. | | | | J SAND | 8190 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/8/2022 Interval Top: 8170 ft. Interval Bottom: 8204 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | J S PERF 8170-8204 HOLES 60 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,336 gal Slickwater w/ 115,300# 30/50, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8170 ft. | # Of Holes: | 60 | Interval Bottom: | 8204 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 10/14/2011 Interval Top: 7536 ft. Interval Bottom: 8204 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | NB PERF 7536-7624 HOLES 62 SIZE 0.42
CD PERF 7726-7742 HOLES 64 SIZE 0.42
J S PERF 8170-8204 HOLES 60 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8146 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 10 | BTU_GAS | 1452 | CALC_BBLS_OIL | 10 | CALC_GOR | 10000 | CALC_MCF_GAS | 100 | CASING_PRESS | 1568 | GRAVITY_OIL | 53 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7536 ft. | # Of Holes: | 186 | Interval Bottom: | 8204 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/8/2022 Interval Top: 7536 ft. Interval Bottom: 7742 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/4/2011 | Treatment Summary: | NB PERF 7536-7624 HOLES 62 SIZE 0.42 CD PERF 7726-7742 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 242,844 gal Slickwater w/ 200,800# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 208,217 gal Slickwater w/ 149,980# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7536 ft. | # Of Holes: | 126 | Interval Bottom: | 7742 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|