|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 8210 ft. Vertical TD: 7845 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/10/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 1193 FNL 1109 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 1202 FNL 1111 FEL | | Proposed Depth/Form: | 8088 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8088 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8088 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/2/2011 | | Spud Date: | 6/28/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8210 ft. | Measured PB depth: | 8148 ft. | | True Vertical TD: | 7845 ft. | True Vertical PB depth: | 7783 ft. | | Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 1193 FNL 1109 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 1202 FNL 1111 FEL | | Log Types: | AC-TR-SD-DSN; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 836 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 836 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8169 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 233, Top: 6600 ft., Bottom: 8169 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1140 ft., Depth: 5627 ft., Bottom: 5660 ft., Sacks: 715, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4288 ft. | 4500 ft. | | | | SUSSEX | 4672 ft. | 5050 ft. | | | | NIOBRARA | 7316 ft. | | | | | FORT HAYS | 7576 ft. | | | | | CODELL | 7599 ft. | | | | | J SAND | 8052 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 8054 ft. Interval Bottom: 8090 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/25/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/5/2011 | | Treatment Summary: | J S PERF 8054-8090 HOLES 62 SIZE 0.40
Frac J-Sand down 4-1/2" Csg w/ 147,214 gal Slickwater w/ 115,600# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8054 ft. | # Of Holes: | 62 | | Interval Bottom: | 8090 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: Status: CM - 8/25/2011 Interval Top: 7372 ft. Interval Bottom: 8090 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/25/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/5/2011 | | Treatment Summary: | NB PERF 7372-7517 HOLES 68 SIZE 0.40
CD PERF 7600-7616 HOLES 64 SIZE 0.42
J S PERF 8054-8090 HOLES 62 SIZE 0.40 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/25/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 19 | | BTU_GAS | 1208 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 4947 | | CALC_MCF_GAS | 94 | | CASING_PRESS | 1264 | | GRAVITY_OIL | 52 | | MCF_GAS | 94 |
| | Perforation Data: | | Interval Top: | 7372 ft. | # Of Holes: | 194 | | Interval Bottom: | 8090 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 7372 ft. Interval Bottom: 7616 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/25/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/16/2011 | | Treatment Summary: | NB PERF 7372-7517 HOLES 68 SIZE 0.40 CD PERF 7600-7616 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,141 gal Slickwater w/ 201,860# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 212,207 gal Slickwater w/ 151,140# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7372 ft. | # Of Holes: | 132 | | Interval Bottom: | 7616 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2021 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|