|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2025 Measured TD: 10435 ft. Vertical TD: 6134 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/2/2013 | | Proposed Top PZ Location: | Sec:22 Twp: 9N 59W | Footage: 929 FNL 719 FWL | | Bottom Hole Location: | Sec:22 Twp: 9N 59W | Footage: 600 FSL 2615 FWL | | Proposed Depth/Form: | 10417 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6374 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 675, Top: 0 ft., Bottom: 6374 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5624 ft., Depth: 10591 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 305, Top: 5624 ft., Bottom: 10591 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/18/2013 | | Spud Date: | 1/11/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 10435 ft. | Measured PB depth: | 10435 ft. | | True Vertical TD: | 6134 ft. | True Vertical PB depth: | 6134 ft. | | Top PZ Location: | Sec:22 Twp: 9N 59W | Footage: 1203 FNL 456 FWL | | Bottom Hole Location: | Sec:22 Twp: 9N 59W | Footage: 704 FSL 672 FWL | | Log Types: | CBL/Mud/Gamma. | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 627 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 326, Top: 0 ft., Bottom: 627 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6561 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 676 ft., Bottom: 6561 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6454 ft., Depth: 10376 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2556 ft. | | | | | PARKMAN | 3470 ft. | | | | | SUSSEX | 4200 ft. | | | | | SHANNON | 4626 ft. | | | | | NIOBRARA | 6183 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 7/1/2025 Interval Top: 6882 ft. Interval Bottom: 10353 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/24/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/11/2013 | Treatment End Date: | 2/11/2013 | | Treatment Summary: | Frac'd the Niobrara w/ 2276375 gals of Silverstim and Slick Water with 3411152#'s of Ottawa sand. | | Total fluid used in treatment (bbls): | 54199 | Max pressure during treatment (psi): | 5490 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 3682 | Total flowback volume recovered (bbls): | 9651 | | Fresh water used in treatment (bbls): | 50516 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3411152 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6451 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/6/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 195 | | BBLS_OIL | 195 | | BTU_GAS | 1342 | | CALC_BBLS_H2O | 195 | | CALC_BBLS_OIL | 195 | | CALC_GOR | 158 | | CALC_MCF_GAS | 31 | | CASING_PRESS | 951 | | GRAVITY_OIL | 37 | | MCF_GAS | 31 | | TUBING_PRESS | 389 |
| | Perforation Data: | | Interval Top: | 6882 ft. | # Of Holes: | 0 | | Interval Bottom: | 10353 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2026 |
| Total Gas Produced (MCF) | 1487 |
| GOR | 733 |
| GOR Determination | BOE |
| Average BOE per Day | 6.188 |
| Average MCFE per Day | 35.892 |
| Federal Financial Assurance | i | |
|
|