|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/13/2024 Measured TD: 8014 ft. Vertical TD: 7884 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/13/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 50 FSL 50 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 50 FSL 50 FWL | | Proposed Depth/Form: | 8111 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24# , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8111 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8111 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/13/2011 | | Spud Date: | 11/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8014 ft. | Measured PB depth: | 7987 ft. | | True Vertical TD: | 7884 ft. | True Vertical PB depth: | 7857 ft. | | Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 66 FSL 69 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 64 FSL 72 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 841 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 841 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8004 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 233, Top: 6632 ft., Bottom: 8004 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5617 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 750 ft., Bottom: 5637 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4178 ft. | | | | | SUSSEX | 4546 ft. | 4736 ft. | | | | NIOBRARA | 7153 ft. | | | | | FORT HAYS | 7412 ft. | | | | | CODELL | 7436 ft. | | | | | J SAND | 7886 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/13/2024 Interval Top: 7890 ft. Interval Bottom: 7932 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2011 | | Treatment Summary: | J S PERF 7890-7932 HOLES 60 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,126 gal Slickwater w/ 114,960# 40/70, 4,000# SuperLC. Broke @ 2,651 psi @ 5.5 bpm. ATP=1,932 psi; MTP=3,369 psi; ATR=35.1 bpm; ISDP=1,594 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7890 ft. | # Of Holes: | 60 | | Interval Bottom: | 7932 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/4/2012 Interval Top: 7440 ft. Interval Bottom: 7452 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/3/2012 | | Treatment Summary: | CD PERF 7440-7452 HOLES 60 SIZE 0.42
Frac Codell down 4-1/2" Csg w/ 201,768 gal Slickwater w/ 150,080# 40/70, 4,000# SuperLC. Broke @ 2,960 psi @ 5 bpm. ATP=4,666 psi; MTP=5,422 psi; ATR=62.1 bpm; ISDP=3,354 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7440 ft. | # Of Holes: | 60 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/7/2012 Interval Top: 7212 ft. Interval Bottom: 7932 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2011 | | Treatment Summary: | NB PERF 7212-7350 HOLES 62 SIZE 0.42
CD PERF 7440-7452 HOLES 60 SIZE 0.42
J S PERF 7890-7932 HOLES 60 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/7/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | BTU_GAS | 1150 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 1650 | | GRAVITY_OIL | 53 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 182 | | Interval Bottom: | 7932 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/13/2024 Interval Top: 7212 ft. Interval Bottom: 7452 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/3/2012 | | Treatment Summary: | NB PERF 7212-7350 HOLES 62 SIZE 0.42 CD PERF 7440-7452 HOLES 60 SIZE 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 122 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/4/2012 Interval Top: 7212 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/3/2012 | | Treatment Summary: | NB PERF 7212-7350 HOLES 62 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 234,318 gal Slickwater w/ 200,180# 40/70, 4,000# SuperLC. Broke @ 3,691 psi @ 5.7 bpm. ATP=4,697 psi; MTP=5,041 psi; ATR=63.9 bpm; ISDP=3,239 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 62 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|