Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33007
Well Classification: GW Status: PA - 9/13/2024
Well Name/No:MARKHAM #35-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/13/2024
FacilityID:421676LocationID:318671
County:WELD #123Location:SWSW 8 2N65W 6
Field:WATTENBERG - #90750Elevation:4940 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1098FSL  672 FWLLat/Long: 40.148975 / -104.694828Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.148975 / -104.694825Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/6/2012
End Date: 1/6/2012
Reported: 3/22/2012
Prior to rule 205A.b.(2)(A)
Days to report: 76
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 9/13/2024             Measured TD: 8036 ft.    Vertical TD: 7905 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 9/13/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/26/2013
Proposed Top PZ Location:Sec:8 Twp: 2N 65W Footage: 50 FSL  1270 FWL
Bottom Hole Location:Sec:8 Twp: 2N 65W Footage: 50 FSL  1270 FWL
Proposed Depth/Form:8108 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 560, Top: , Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8108 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8108 ft.

Wellbore Completed
Completion Date:11/5/2011
Spud Date:11/1/2011Spud Date Is:ACTUAL
Measured TD:8036 ft.Measured PB depth:8011 ft.
True Vertical TD:7905 ft.True Vertical PB depth:7880 ft.
Top PZ Location:Sec:8 Twp: 2N 65WFootage: 47 FSL  1244 FWL
Bottom Hole Location:Sec:8 Twp: 2N 65WFootage: 27 FSL  1230 FWL
Log Types:PRE FORM 5
Log Types:CBL NO OPEN HOLE LOGS.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 837 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 837 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8026 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 7789 ft., Bottom: 8026 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7776 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 966, Top: 585 ft., Bottom: 7776 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4060 ft.
SUSSEX4450 ft.
NIOBRARA7160 ft.
FORT HAYS7400 ft.
CODELL7412 ft.
J SAND7870 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/13/2024                 Interval Top: 7872 ft.    Interval Bottom: 7915 ft.

 Completed Information for Formation J SAND
1st Production Date:2/6/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/22/2011
Treatment Summary:J S PERF 7872-7915 HOLES 60 SIZE 0.38 Frac J-Sand down 4-1/2" Csg w/ 143,640 gal Slickwater w/ 116,220# 40/70, 4,000# SuperLC, 0# . Broke @ 3,432 psi @ 5.1 bpm. ATP=2,280 psi; MTP=3,852 psi; ATR=33.7 bpm; ISDP=1,845 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7872 ft.# Of Holes:60
Interval Bottom:7915 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/4/2012                  Interval Top: 7412 ft.    Interval Bottom: 7426 ft.

 Completed Information for Formation CODELL
1st Production Date:2/6/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2012
Treatment Summary:CD PERF 7412-7426 HOLES 56 SIZE 0.42 Frac Codell down 4-1/2" Csg w/ 209,706 gal Slickwater w/ 149,900# 40/70, 4,000# SuperLC. Broke @ 3,809 psi @ 9.4 bpm. ATP=4,463 psi; MTP=5,076 psi; ATR=60.2 bpm; ISDP=3,202 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7412 ft.# Of Holes:56
Interval Bottom:7426 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/7/2012                  Interval Top: 7204 ft.    Interval Bottom: 7915 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/6/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/22/2011
Treatment Summary:NB PERF 7204-7304 HOLES 64 SIZE 0.42 CD PERF 7412-7426 HOLES 56 SIZE 0.42 J S PERF 7872-7915 HOLES 60 SIZE 0.38
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1150
CALC_BBLS_OIL 10
CALC_GOR 10000
CALC_MCF_GAS 100
CASING_PRESS 2200
GRAVITY_OIL 53
MCF_GAS 100
Perforation Data:
Interval Top:7204 ft.# Of Holes:180
Interval Bottom:7915 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/13/2024                 Interval Top: 7204 ft.    Interval Bottom: 7426 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/6/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2012
Treatment Summary:NB PERF 7204-7304 HOLES 64 SIZE 0.42 CD PERF 7412-7426 HOLES 56 SIZE 0.42
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7204 ft.# Of Holes:120
Interval Bottom:7426 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/4/2012                  Interval Top: 7204 ft.    Interval Bottom: 7304 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/6/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2012
Treatment Summary:NB PERF 7204-7304 HOLES 64 SIZE 0.42 Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 241,880 gal Slickwater w/ 201,920# 40/70, 4,000# SuperLC. Broke @ 3,301 psi @ 5.4 bpm. ATP=4,374 psi; MTP=4,809 psi; ATR=60.2 bpm; ISDP=3,195 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7204 ft.# Of Holes:64
Interval Bottom:7304 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/13/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No