Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32994
Well Classification: OW Status: SI - 7/1/2021
Well Name/No:NICHOLS #18-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2021
FacilityID:421651LocationID:332301
County:WELD #123Location:NENW 8 2N65W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:707FNL  1955 FWLLat/Long: 40.158572 / -104.690119Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158581 / -104.690132Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/26/2011
End Date: 7/26/2011
Reported: 8/10/2011
Prior to rule 205A.b.(2)(A)
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2021             Measured TD: 8015 ft.    Vertical TD: 7890 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/17/2013
Proposed Top PZ Location:Sec:8 Twp: 2N 65W Footage: 1320 FNL  1320 FWL
Bottom Hole Location:Sec:8 Twp: 2N 65W Footage: 1320 FNL  1320 FWL
Proposed Depth/Form:7981 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 560, Top: , Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7981 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 7981 ft.

Wellbore Completed
Completion Date:6/7/2011
Spud Date:6/3/2011Spud Date Is:ACTUAL
Measured TD:8015 ft.Measured PB depth:7970 ft.
True Vertical TD:7890 ft.True Vertical PB depth:7845 ft.
Top PZ Location:Sec:8 Twp: 2N 65WFootage: 1308 FNL  1310 FWL
Bottom Hole Location:Sec:8 Twp: 2N 65WFootage: 1299 FNL  1310 FWL
Log Types:PRE FORM 5
Log Types:AC-TR-SD-DSN; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24.0 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7990 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 251, Top: 6070 ft., Bottom: 7990 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 90 ft., Depth: 5596 ft., Bottom: 5596 ft., Sacks: 851, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 90 ft., Depth: 5592 ft., Bottom: 5650 ft., Sacks: 851, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4708 ft.
NIOBRARA7180 ft.
FORT HAYS7355 ft.
CODELL7378 ft.
J SAND7830 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 7/1/2021                  Interval Top: 7830 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J SAND
1st Production Date:8/10/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2011
Treatment Summary:J S PERF 7830-7866 HOLES 66 SIZE 0.38 Frac J-Sand down 4-1/2" Csg w/ 147,525 gal Slickwater w/ 143,460# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7830 ft.# Of Holes:66
Interval Bottom:7866 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:                     Status:  CM - 8/10/2011                 Interval Top: 7154 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/10/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2011
Treatment Summary:NB PERF 7154-7298 HOLES 70 SIZE 0.42 CD PERF 7378-7394 HOLES 64 SIZE 0.42 J S PERF 7830-7866 HOLES 66 SIZE 0.38
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/10/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 33
BTU_GAS 1208
CALC_BBLS_OIL 33
CALC_GOR 3242
CALC_MCF_GAS 107
CASING_PRESS 1974
GRAVITY_OIL 52
MCF_GAS 107
Perforation Data:
Interval Top:7154 ft.# Of Holes:200
Interval Bottom:7866 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 7/1/2021                  Interval Top: 7154 ft.    Interval Bottom: 7394 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/10/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2011
Treatment Summary:NB PERF 7154-7298 HOLES 70 SIZE 0.42 CD PERF 7378-7394 HOLES 64 SIZE 0.42 Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 245,868 gal Slickwater w/ 201,460# 40/70, 4,000# SB Excel Frac Codell down 4-1/2" Csg w/ 204,036 gal Slickwater w/ 150,180# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7154 ft.# Of Holes:134
Interval Bottom:7394 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2021
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No