Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32896
Well Classification: OW Status: PA - 1/10/2025
Well Name/No:RASMUSSEN #2-4-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/10/2025
FacilityID:421338LocationID:333145
County:WELD #123Location:SENW 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1962FNL  1780 FWLLat/Long: 40.111500 / -105.011350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.111504 / -105.011341Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/24/2013
End Date: 4/25/2013
Reported: 6/27/2013
Days to report: 63
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 1/10/2025             Measured TD: 7835 ft.    Vertical TD: 7768 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 1/10/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/12/2015
Proposed Top PZ Location:Sec:28 Twp: 2N 68W Footage: 2585 FNL  1302 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68W Footage: 2575 FNL  1319 FWL
Proposed Depth/Form:8189 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:3/22/2013
Spud Date:3/17/2013Spud Date Is:ACTUAL
Measured TD:7835 ft.Measured PB depth:7780 ft.
True Vertical TD:7768 ft.True Vertical PB depth:7713 ft.
Top PZ Location:Sec:28 Twp: 2N 68WFootage: 2585 FNL  1302 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68WFootage: 2575 FNL  1319 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 848 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 848 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 4910 ft., Depth: 7824 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 4910 ft., Bottom: 7824 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4422 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 3810 ft., Bottom: 4412 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4364 ft.
SHANNON4929 ft.
SHARON SPRINGS7304 ft.
NIOBRARA7417 ft.
FORT HAYS7650 ft.
CODELL7670 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/7/2013                 Interval Top: 7671 ft.    Interval Bottom: 7690 ft.

 Completed Information for Formation CODELL
1st Production Date:6/21/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/24/2013
Treatment Summary:Mesa Wireline perforated Codell 7671-7690 w/3 jspf - 57 holes. 4-21-2013 Frac Codell with 110,770# 40/70 with 3154 bbls SLF. 4-24-2013
Total fluid used in treatment (bbls):3154Max pressure during treatment (psi):6250
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):670
Fresh water used in treatment (bbls):3154Disposition method For flowback:DISPOSAL
Total proppant used (lbs):110770Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7671 ft.# Of Holes:57
Interval Bottom:7690 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 1/10/2025                 Interval Top: 7492 ft.    Interval Bottom: 7690 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/21/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Drill up kill plug @ 7400'. Continue in hole to next CFP @ 7607'. Drill up plug and continue past Codell Perfs @ 7671'. 5-6-2013 Mesa Wireline perforated Codell 7671-7690 w/3 jspf - 57 holes. 4-21-2013 Frac Codell with 110,770# 40/70 with 3154 bbls SLF. 4-24-2013 Set CFP @ 7550, perforate Niobrara. 4-24-2013 Frac Niobrara with 112,500 # 40/70 with 3126 bbls SLF. 4-25-2013
Total fluid used in treatment (bbls):6280Max pressure during treatment (psi):6250
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):670
Fresh water used in treatment (bbls):6280Disposition method For flowback:DISPOSAL
Total proppant used (lbs):216910Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7634 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 98
BTU_GAS 1148
CALC_BBLS_H2O 28
CALC_BBLS_OIL 98
CALC_GOR 3255
CALC_MCF_GAS 319
CASING_PRESS 1265
GRAVITY_OIL 51
MCF_GAS 319
TUBING_PRESS 490
Perforation Data:
Interval Top:7492 ft.# Of Holes:113
Interval Bottom:7690 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/7/2013                 Interval Top: 7492 ft.    Interval Bottom: 7506 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/21/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/24/2013Treatment End Date:4/25/2013
Treatment Summary:Set CFP @ 7550, perforate Niobrara. 4-24-2013 Frac Niobrara with 112,500 # 40/70 with 3126 SLF. 4-25-2013
Total fluid used in treatment (bbls):3126Max pressure during treatment (psi):5460
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):670
Fresh water used in treatment (bbls):3126Disposition method For flowback:DISPOSAL
Total proppant used (lbs):112500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7492 ft.# Of Holes:56
Interval Bottom:7506 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No