|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/10/2025 Measured TD: 8578 ft. Vertical TD: 8148 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/10/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/12/2015 | | Proposed Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 23 FNL 2615 FWL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 50 FNL 2609 FWL | | Proposed Depth/Form: | 8505 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8505 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7444 ft., Bottom: 8505 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5116 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 4126 ft., Bottom: 5116 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/10/2013 | | Spud Date: | 3/6/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8578 ft. | Measured PB depth: | 8538 ft. | | True Vertical TD: | 8148 ft. | True Vertical PB depth: | 8108 ft. | | Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 23 FNL 2615 FWL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 50 FNL 2609 FWL | | Log Types: | CBL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 812 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 822 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8561 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 4160 ft., Bottom: 8578 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4700 ft. | | | | | SHANNON | 5283 ft. | | | | | SHARON SPRINGS | 7614 ft. | | | | | NIOBRARA | 7712 ft. | | | | | FORT HAYS | 7977 ft. | | | | | CODELL | 7999 ft. | | | | | J SAND | 8430 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/10/2025 Interval Top: 8434 ft. Interval Bottom: 8463 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/21/2013 | Treatment End Date: | 4/25/2013 | | Treatment Summary: | Mesa Wireline perforated J Sand 8434' - 8439' & 8443' - 8463' w/ 3 jspf - total of 75 holes.
Frac J Sand with 111,250# 20/40 with 114,450 gals SLF.
| | Total fluid used in treatment (bbls): | 10445 | Max pressure during treatment (psi): | 3260 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 504 | Min frac gradient (psi/ft): | 0.72 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 750 | | Fresh water used in treatment (bbls): | 9941 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 337641 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8434 ft. | # Of Holes: | 75 | | Interval Bottom: | 8463 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/4/2014 Interval Top: 8000 ft. Interval Bottom: 8020 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/23/2013 | Treatment End Date: | 4/23/2013 | | Treatment Summary: | Set CFP @8060'. 04-23-2013
Frac Codell with 108,300# 40/70 with 113,106 gallons SLF. 04-23-2013 | | Total fluid used in treatment (bbls): | 3129 | Max pressure during treatment (psi): | 6137 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 2693 | Total flowback volume recovered (bbls): | 750 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 108300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8000 ft. | # Of Holes: | 60 | | Interval Bottom: | 8020 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 6/15/2015 Interval Top: 7779 ft. Interval Bottom: 8463 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/25/2013 | Treatment End Date: | N/A | | Treatment Summary: | Continue in hold to next CFP @ 7830' and 8060'. Drill up plug and continue to top J-sand Perfs @ 8434'. 04-05-2013 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/21/2013 | Treatment End Date: | 4/25/2013 | | Treatment Summary: | Continue in hold to next CFP @ 7830' and 8060'. Drill up plug and continue to top J Sand perf at 8434'. 04-05-13 | | Total fluid used in treatment (bbls): | 10445 | Max pressure during treatment (psi): | 6173 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 504 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1500 | | Fresh water used in treatment (bbls): | 9941 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 337641 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8426 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 58 | | BBLS_OIL | 57 | | BTU_GAS | 1148 | | CALC_BBLS_H2O | 58 | | CALC_BBLS_OIL | 57 | | CALC_GOR | 4140 | | CALC_MCF_GAS | 236 | | CASING_PRESS | 1186 | | GRAVITY_OIL | 51 | | MCF_GAS | 236 | | TUBING_PRESS | 342 |
| | Perforation Data: | | Interval Top: | 7779 ft. | # Of Holes: | 191 | | Interval Bottom: | 8463 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/10/2025 Interval Top: 7779 ft. Interval Bottom: 8020 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/21/2013 | Treatment End Date: | 4/25/2013 | | Treatment Summary: | Set CFP @8060'. 04-23-2013 Frac Codell with 108,300# 40/70 with 113,106 gallons SLF. 04-23-2013
Set CFP @ 7830', Perforate Niobrara. 04.23.2013 Frac Niobrara B with 111,700# 40/70 with 113,820 gals SLF. 04.24.2013 | | Total fluid used in treatment (bbls): | 6660 | Max pressure during treatment (psi): | 6173 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 5403 | Total flowback volume recovered (bbls): | 1500 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 220000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7779 ft. | # Of Holes: | 116 | | Interval Bottom: | 8020 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/4/2014 Interval Top: 7779 ft. Interval Bottom: 7793 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/23/2013 | Treatment End Date: | 4/24/2013 | | Treatment Summary: | Set CFP @ 7830', Perforate Niobrara. 04.23.2013
Frac Niobrara B with 111,700# 40/70 with 113,820 gals SLF. 04.24.2013 | | Total fluid used in treatment (bbls): | 3531 | Max pressure during treatment (psi): | 5450 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 2710 | Total flowback volume recovered (bbls): | 750 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 111700 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7779 ft. | # Of Holes: | 56 | | Interval Bottom: | 7793 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/10/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 300 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.140 |
| Average MCFE per Day | 0.806 |
| Federal Financial Assurance | i | |
|
|