Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32891
Well Classification: GW Status: PA - 2/9/2023
Well Name/No:Antelope #32-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/9/2023
FacilityID:421333LocationID:421167
County:WELD #123Location:SENE 31 5N62W 6
Field:WATTENBERG - #90750Elevation:4593 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1960FNL  660 FELLat/Long: 40.358030 / -104.359360Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.358060 / -104.359330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/9/2023             Measured TD: 6852 ft.    Vertical TD: 6670 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/9/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/26/2013
Proposed Top PZ Location:Sec:31 Twp: 5N 62W Footage: 1960 FNL  1979 FEL
Bottom Hole Location:Sec:31 Twp: 5N 62W Footage: 1960 FNL  1979 FEL
Proposed Depth/Form:6850 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: NWNE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 400 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 0 ft., Bottom: 400 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6850 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 247, Top: 5800 ft., Bottom: 6850 ft.

Wellbore Completed
Completion Date:5/16/2011
Spud Date:5/12/2011Spud Date Is:ACTUAL
Measured TD:6852 ft.Measured PB depth:6819 ft.
True Vertical TD:6670 ft.True Vertical PB depth:6637 ft.
Top PZ Location:Sec:31 Twp: 5N 62WFootage: 1960 FNL  1979 FEL
Bottom Hole Location:Sec:31 Twp: 5N 62WFootage: 1960 FNL  1979 FEL
Log Types:CBL, GR, CD, DN, Dl
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 434 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 434 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6843 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 3268 ft., Bottom: 6843 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3436 ft.
SUSSEX4197 ft.
NIOBRARA6428 ft.
FORT HAYS6662 ft.
CODELL6685 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/28/2022                 Interval Top: 6686 ft.    Interval Bottom: 6696 ft.

 Completed Information for Formation CODELL
1st Production Date:7/16/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6686 ft.# Of Holes:40
Interval Bottom:6696 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/9/2023                  Interval Top: 6432 ft.    Interval Bottom: 6696 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/16/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2011
Treatment Summary:CODELL PUMPED 32,508 GAL PAD FLUID. PUMPED 103,950 GAL PHASERFRAC W/250,120 LBS 20/40 SAND. ISDP 3163 PSI, ATP 3620 PSI, ATR 21.9 BPM. NIOBRARA PUMPED 19,488 PAD FLUID. PUMPED 118,188 GAL PHASERFRAC W/260,120 LBS. 30/50 SAND. ISDP 3075 PSI, ATP 3986 PSI, ATR 49.7 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 74
BBLS_OIL 79
BTU_GAS 1283
CALC_BBLS_H2O 74
CALC_BBLS_OIL 79
CALC_GOR 63
CALC_MCF_GAS 5
CASING_PRESS 636
GRAVITY_OIL 40
MCF_GAS 5
Perforation Data:
Interval Top:6432 ft.# Of Holes:88
Interval Bottom:6696 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/28/2022                 Interval Top: 6432 ft.    Interval Bottom: 6588 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/16/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6432 ft.# Of Holes:48
Interval Bottom:6588 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/09/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No