Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32765
Well Classification: OW Status: PA - 6/23/2020
Well Name/No:BINDER #0-6-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/23/2020
FacilityID:420953LocationID:420955
County:WELD #123Location:NESW 20 4N67W 6
Field:WATTENBERG - #90750Elevation:4906 ft.
Planned Location:2479FSL  2247 FWLLat/Long: 40.298140 / -104.914970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.298148 / -104.914984Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/7/2012
End Date: 5/7/2012
Reported: 5/15/2012
Days to report: 8
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/23/2020             Measured TD: 8045 ft.    Vertical TD: 7435 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/23/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/22/2012
Proposed Top PZ Location:Sec:20 Twp: 4N 67W Footage: 1356 FSL  68 FWL
Bottom Hole Location:Sec:20 Twp: 4N 67W Footage: 1356 FSL  68 FWL
Proposed Depth/Form:7720 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2 SW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2 SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 490 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 490 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7720 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 150, Top: 6930 ft., Bottom: 7720 ft.

Wellbore Completed
Completion Date:1/14/2012
Spud Date:1/9/2012Spud Date Is:ACTUAL
Measured TD:8045 ft.Measured PB depth:7984 ft.
True Vertical TD:7435 ft.True Vertical PB depth:7374 ft.
Top PZ Location:Sec:20 Twp: 4N 67WFootage: 1356 FSL  68 FWL
Bottom Hole Location:Sec:20 Twp: 4N 67WFootage: 1356 FSL  68 FWL
Log Types:Triple Combo High Resolution Induction Compenstated Density/Neutron Gamma Ray
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 509 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 507 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8033 ft., Weight: 11.5 , Citings Type: ACTUAL
Cement:Sacks: 605, Top: 2090 ft., Bottom: 8033 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2494 ft.
PARKMAN3958 ft.
SUSSEX4628 ft.
SHANNON5162 ft.
NIOBRARA7554 ft.
FORT HAYS7843 ft.
CODELL7865 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/21/2013                 Interval Top: 7864 ft.    Interval Bottom: 7884 ft.

 Completed Information for Formation CODELL
1st Production Date:4/18/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2012
Treatment Summary:Codell Frac Treatment Codell Treatment Totals: Cln Fluid: 3986.3 bbls, Sand Laden Fluid: 2496.5 bbls, Proppant: 1111,780 lbs 30/50, ATP: 4660 psi, ATR: 59.1 bpm, MTP: 5858 psi, MTR: 59.2 bpm.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7864 ft.# Of Holes:37
Interval Bottom:7884 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/23/2020                 Interval Top: 7563 ft.    Interval Bottom: 7884 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/18/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 169
BTU_GAS 1361
CALC_BBLS_H2O 6
CALC_BBLS_OIL 169
CALC_GOR 1219
CALC_MCF_GAS 206
CASING_PRESS 2100
GRAVITY_OIL 52
MCF_GAS 206
TUBING_PRESS 240
Perforation Data:
Interval Top:7563 ft.# Of Holes:53
Interval Bottom:7884 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/21/2013                 Interval Top: 7563 ft.    Interval Bottom: 7735 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2012
Treatment Summary:Niobrara Frac Treatment Niobrara Treatment Totals: Cln Fluid: 5960.3 bbls, Sand Laden Fluid: 4324.8 bbls, Proppant: 200,380 lbs 40/50, 4000 20/40 SLC ATP: 4644 psi, ATR: 61.2 bpm, MTP: 6419 psi, MTR: 61.4 bpm.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7563 ft.# Of Holes:16
Interval Bottom:7735 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/23/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No