Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32754
Well Classification: GW Status: PR - 11/1/2024
Well Name/No:Front Range #11-17-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KP KAUFFMAN COMPANY INC - 46290
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2024
FacilityID:420928LocationID:332832
County:WELD #123Location:NESW 17 4N66W 6
Field:WATTENBERG - #90750Elevation:4721 ft.
Planned Location:1515FSL  1931 FWLLat/Long: 40.308570 / -104.804140Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.308470 / -104.804120Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2024             Measured TD: 7620 ft.    Vertical TD: 7381 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/20/2012
Proposed Top PZ Location:Sec:17 Twp: 4N 66W Footage: 2246 FNL  2104 FWL
Bottom Hole Location:Sec:17 Twp: 4N 66W Footage: 2246 FNL  2104 FWL
Proposed Depth/Form:8574 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24# , Citings Type: PLANNED
Cement:Sacks: 500, Top: , Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8574 ft., Weight: 11.5# , Citings Type: PLANNED
Cement:Sacks: 800, Top: , Bottom: 8574 ft.

Wellbore Completed
Completion Date:8/5/2011
Spud Date:7/30/2011Spud Date Is:ACTUAL
Measured TD:7620 ft.Measured PB depth:7585 ft.
True Vertical TD:7381 ft.True Vertical PB depth:7346 ft.
Top PZ Location:Sec:17 Twp: 4N 66WFootage: 2246 FNL  2104 FWL
Bottom Hole Location:Sec:17 Twp: 4N 66WFootage: 2246 N  2104 W
Log Types:Triple combo- CDL-CNL-DIL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 705 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 502, Top: 0 ft., Bottom: 705 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7602 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 512, Top: 2780 ft., Bottom: 7302 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3771 ft.
SUSSEX4446 ft.
SHANNON4879 ft.
NIOBRARA7122 ft.
FORT HAYS7425 ft.
CODELL7449 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 10/15/2011                Interval Top: 7445 ft.    Interval Bottom: 7460 ft.

 Completed Information for Formation CODELL
1st Production Date:10/13/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/27/2011
Treatment Summary:call for 6000 psi max kickouts 5800 psi open well. pump active pad 60 bbls formation break 4331 psi@ 5.0 bpm. isip. 2783 psi 1min 2517 psi 5 min 2251 psi . 532 psi leakoff. pump FR water pap 762 bbls. at 3676 psi @15.2 bpm. pump 1 thru 4 ppg 235,945 # Prefferred Rock 20/40. 8,000 # SB Excel 20/40 57.1 bbls Acive fluid pad . 2187.5 bbls phaser 2068.1bbls SLF. avg press 4037 psi. LOAD TO RECOVER 3166.9 BBLS. avg rate 41.5 bpm.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/2011Test Method:flowing
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 41
BTU_GAS 1233
CALC_BBLS_H2O 1
CALC_BBLS_OIL 41
CALC_GOR 10049
CALC_MCF_GAS 412
GRAVITY_OIL 57
MCF_GAS 412
Perforation Data:
Interval Top:7445 ft.# Of Holes:60
Interval Bottom:7460 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:                     Status:  PR - 11/1/2024                 Interval Top: 7130 ft.    Interval Bottom: 7460 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7130 ft.# Of Holes:124
Interval Bottom:7460 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 10/15/2011                Interval Top: 7130 ft.    Interval Bottom: 7245 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/13/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/28/2011
Treatment Summary:formation break 4139 psi @4.6 1 m isip 3472 psi 1 min 3403 psi 1 5 min 3238 psi pump 119 bbls active fluid pad @10.3 bpm at 3800 psi 2 pump FR water pad 1429 bbls @ 50.6 bpm at 4515 psi. 3 pump phaser pad 143 bbls @. 50.8 bpm 4502 psi. 4 pump phaser pad 167 bbls 7000# 1ppg 30/50 @ 50.8 bpm at 44732 p 73 PSI 5 pump phaser pad 786 bbls 66000 # 2 ppg 30/50 50.5 bpm at4586 psi. 6 pump phaser pad 5224 bbls 66000# 3 ppg 30.50 @50.5 bpm at 4555 psi. 7 pump phaser pad 310 bbls 39000# 3ppg 30/50@50.3 bpm at4462 psi. 8 pump phaser pad 238 bbls 40,000 # 4 ppgg 30/50 @50.6 bpm. At 4461 psi 9 pump phaser pad 143 bbls 24000 # 4 ppg 30/50 @ 50.5 bpm at 4369 psi. 10 pump phaser pad 48 bbls 8000 # SB Excel 20/40 @ 11 flush 119 bbls @50.8 bpm at 4455 psi isip 3617 psi 5min 3419 psi avg press 4511 psi rate 50.5 bpm max press 5325 psi rate 51.4 bpm ACIVE FLUID PAD 117.7 BBLS PHASER 2408.9 BBLS SLF 2242.0 BBLS LOAD TO RECOVER 4105.4 BBLS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/2011Test Method:flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 41
BTU_GAS 1233
CALC_BBLS_H2O 1
CALC_BBLS_OIL 41
CALC_GOR 10049
CALC_MCF_GAS 412
GRAVITY_OIL 57
MCF_GAS 412
Perforation Data:
Interval Top:7130 ft.# Of Holes:64
Interval Bottom:7245 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)1819
GOR53500
GOR DeterminationMCFE
Average BOE per Day0.945
Average MCFE per Day5.473

 Federal Financial Assurance  i 

 Tribal Well  i No