|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/12/2023 Measured TD: 7432 ft. Vertical TD: 6993 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/12/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/15/2012 | | Proposed Top PZ Location: | Sec:16 Twp: 3n 65w | Footage: 977 FSL 1033 FWL | | Bottom Hole Location: | Sec:16 Twp: 3n 65w | Footage: 977 FSL 1033 FWL | | Proposed Depth/Form: | 11180 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: , Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 720, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 7336 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: , Bottom: 7336 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 11180 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 0, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2011 | | Spud Date: | 3/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7432 ft. | Measured PB depth: | 3600 ft. | | True Vertical TD: | 6993 ft. | True Vertical PB depth: | 3600 ft. | | Bottom Hole Location: | Sec:16 Twp: 3n 65w | Footage: 977 FSL 1033 FWL | | Log Types: | n/a | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 796 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 401, Top: 0 ft., Bottom: 796 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.429 in., Size: , Top: 0 ft., Depth: 7381 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 370 ft., Bottom: 7381 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6293 ft., Depth: 11147 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 6840 ft., Depth: 7040 ft., Bottom: 7040 ft., Sacks: 121, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 3600 ft., Depth: 3600 ft., Bottom: 4096 ft., Sacks: 300, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: GW Status: PA - 4/12/2023 Measured TD: 11162 ft. Vertical TD: 6988 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW PA - 4/12/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/5/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 3N 65W | Footage: 796 FSL 505 FWL | | Bottom Hole Location: | Sec:16 Twp: 3N 65W | Footage: 1052 FSL 500 FEL | | Proposed Depth/Form: | 11180 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 796 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 401, Top: 0 ft., Bottom: 796 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7336 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: , Bottom: 7336 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11180 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/14/2011 | | Spud Date: | 3/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 11162 ft. | Measured PB depth: | 11147 ft. | | True Vertical TD: | 6988 ft. | True Vertical PB depth: | 6973 ft. | | Top PZ Location: | Sec:16 Twp: 3N 65W | Footage: 814 FSL 747 FWL | | Bottom Hole Location: | Sec:16 Twp: 3N 65W | Footage: 1067 FSL 504 FEL | | Log Types: | CBL/GRL/CCL/VDL, FMI. | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 796 ft., Weight: 36.00 , Citings Type: ACTUAL | | Cement: | Sacks: 401, Top: 0 ft., Bottom: 796 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7381 ft., Weight: 26.00 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 1600 ft., Bottom: 7432 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6293 ft., Depth: 11147 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7162 ft. | | | |
Formation NBRR Formation Classification: GW Status: AB - 4/12/2023 Interval Top: 7571 ft. Interval Bottom: 11078 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/5/2011 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/1/2011 | | Treatment Summary: | Frac'd the Niobrara w/ 3033529 gals of Silverstim and Slick Water with 4,131,200.0#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/9/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 231 | | BBLS_OIL | 326 | | BTU_GAS | 1277 | | CALC_BBLS_H2O | 231 | | CALC_BBLS_OIL | 326 | | CALC_GOR | 5128 | | CALC_MCF_GAS | 1672 | | GRAVITY_OIL | 57 | | MCF_GAS | 1672 | | TUBING_PRESS | 1955 |
| | Perforation Data: | | Interval Top: | 7571 ft. | # Of Holes: | 0 | | Interval Bottom: | 11078 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/12/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|