|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/24/2023 Measured TD: 8033 ft. Vertical TD: 7787 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/24/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/4/2012 | | Proposed Top PZ Location: | Sec:17 Twp: 3N 67W | Footage: 2600 FSL 50 FWL | | Bottom Hole Location: | Sec:17 Twp: 3N 67W | Footage: 2600 FSL 50 FWL | | Proposed Depth/Form: | 8226 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 525, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8226 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8226 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/31/2011 | | Spud Date: | 3/27/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8033 ft. | Measured PB depth: | 7990 ft. | | True Vertical TD: | 7787 ft. | True Vertical PB depth: | 7743 ft. | | Top PZ Location: | Sec:18 Twp: 3N 67W | Footage: 2550 FSL 50 FWL | | Bottom Hole Location: | Sec:17 Twp: 3N 67W | Footage: 2551 FSL 89 FWL | | Log Types: | CBL, CD-CN-ML, HRI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 770 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 770 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8020 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1070, Top: 96 ft., Bottom: 8020 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4225 ft. | | | | | NIOBRARA | 7160 ft. | | | | | FORT HAYS | 7433 ft. | | | | | CODELL | 7455 ft. | | | | | J SAND | 7860 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 10/24/2023 Interval Top: 7196 ft. Interval Bottom: 7470 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2011 | | Treatment Summary: | NB PERF 7196-7314 HOLES 72 SIZE .42 CD PERF 7456-7470 HOLES 56 SIZE .38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 238,266 gal Slickwater w/ 200,380# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 206,346 gal Slickwater w/ 151,260# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 28 | | BTU_GAS | 1342 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 2107 | | CALC_MCF_GAS | 59 | | CASING_PRESS | 2250 | | GRAVITY_OIL | 47 | | MCF_GAS | 59 |
| | Perforation Data: | | Interval Top: | 7196 ft. | # Of Holes: | 128 | | Interval Bottom: | 7470 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|