|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2025 Measured TD: 8400 ft. Vertical TD: 8081 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/29/2012 | | Proposed Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 1320 FSL 2590 FEL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 1320 FSL 2590 FEL | | Proposed Depth/Form: | 8413 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 960 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 672, Top: 0 ft., Bottom: 960 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8413 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8413 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/16/2011 | | Spud Date: | 2/12/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8362 ft. | | True Vertical TD: | 8081 ft. | True Vertical PB depth: | 8043 ft. | | Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 1319 FSL 2615 FEL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 1325 FSL 2613 FEL | | Log Types: | CBL, SD-DSN-AC-TR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 992 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 992 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8389 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 195, Top: 7095 ft., Bottom: 8389 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 514 ft., Depth: 5965 ft., Bottom: 5965 ft., Sacks: 815, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4790 ft. | | | | | NIOBRARA | 7488 ft. | | | | | FORT HAYS | 7756 ft. | | | | | CODELL | 7780 ft. | | | | | J SAND | 8228 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 8254 ft. Interval Bottom: 8284 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/27/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 147,840 gal Slickwater w/ 115,240# 40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8254 ft. | # Of Holes: | 46 | | Interval Bottom: | 8284 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 5/3/2011 Interval Top: 7554 ft. Interval Bottom: 8284 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/27/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1217 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 2750 | | CALC_MCF_GAS | 88 | | CASING_PRESS | 814 | | GRAVITY_OIL | 48 | | MCF_GAS | 88 |
| | Perforation Data: | | Interval Top: | 7554 ft. | # Of Holes: | 166 | | Interval Bottom: | 8284 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 7554 ft. Interval Bottom: 7818 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/27/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/7/2011 | | Treatment Summary: | NB PERF 7554-7654 HOLES 60 SIZE .42 CD PERF 7798-7818 HOLES 60 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 268,163 gal Slickwater w/ 233,027# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 194,553 gal Slickwater w/ 117,693# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7554 ft. | # Of Holes: | 120 | | Interval Bottom: | 7818 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 150 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.071 |
| Average MCFE per Day | 0.408 |
| Federal Financial Assurance | i | |
|
|