|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 9/1/2024 Measured TD: 8222 ft. Vertical TD: 8049 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/29/2012 | Proposed Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 660 FSL 1980 FEL | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 660 FSL 1980 FEL | Proposed Depth/Form: | 8287 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 960 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 672, Top: 0 ft., Bottom: 960 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8287 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8287 ft. |
| | |
Wellbore Completed | Completion Date: | 2/12/2011 | Spud Date: | 2/7/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8222 ft. | Measured PB depth: | 8183 ft. | True Vertical TD: | 8049 ft. | True Vertical PB depth: | 8010 ft. | Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 652 FSL 1985 FEL | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 669 S 1985 E | Log Types: | PRELIMINARY FORM 5 | Log Types: | SD-DSN-AC-TR; CBL 3/17/11 AND CBL 4/27/11 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 988 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 650, Top: 0 ft., Bottom: 988 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8212 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 7540 ft., Bottom: 8212 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 788 ft., Depth: 5789 ft., Bottom: 5789 ft., Sacks: 957, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 1020 ft., Depth: 5764 ft., Bottom: 5764 ft., Sacks: 777, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 7000 ft., Depth: 7382 ft., Bottom: 7300 ft., Sacks: 100, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4298 ft. | | | | SUSSEX | 4690 ft. | | | | NIOBRARA | 7289 ft. | | | | FORT HAYS | 7640 ft. | | | | CODELL | 7663 ft. | | | | J SAND | 8115 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 9/1/2024 Interval Top: 8136 ft. Interval Bottom: 8156 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/8/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/13/2011 | Treatment Summary: | J S PERF 8136-8156 HOLES 40 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 149,142 gal Slickwater w/ 115,460# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8136 ft. | # Of Holes: | 40 | Interval Bottom: | 8156 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 8/1/2024 Interval Top: 7430 ft. Interval Bottom: 7684 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/2/2011 | Treatment Summary: | NB PERF 7430-7522 HOLES 40 SIZE 0.38 CD PERF 7664-7684 HOLES 60 SIZE 0.38
Frac NB down 2 7/8" w/250 gal 15% HCl and 256,158 gal SW containing 208,820# 40/70 sand and 8000# 20/40 SB Excel
Frac CD down 2 7/8" w/200,592 gal SW containing 142,060# 40/70 sand |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8106 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/22/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 15 | BTU_GAS | 1238 | CALC_BBLS_OIL | 15 | CALC_GOR | 6617 | CALC_MCF_GAS | 100 | CASING_PRESS | 1350 | GRAVITY_OIL | 49 | MCF_GAS | 100 | TUBING_PRESS | 900 |
| Perforation Data: | Interval Top: | 7430 ft. | # Of Holes: | 100 | Interval Bottom: | 7684 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 20 |
Total Gas Produced (MCF) | 410 |
GOR | 20500 |
GOR Determination | MCFE |
Average BOE per Day | 0.245 |
Average MCFE per Day | 1.432 |
Federal Financial Assurance | i | |
|
|