|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/15/2025 Measured TD: 8500 ft. Vertical TD: 8336 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/15/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/26/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 1N 68W | Footage: 678 FSL 509 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 68W | Footage: 680 FSL 494 FEL | | Proposed Depth/Form: | 8558 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8558 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8558 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/2/2011 | | Spud Date: | 2/26/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8500 ft. | Measured PB depth: | 8459 ft. | | True Vertical TD: | 8336 ft. | True Vertical PB depth: | 8295 ft. | | Top PZ Location: | Sec:2 Twp: 1N 68W | Footage: 678 FSL 509 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 68W | Footage: 680 FSL 494 FEL | | Log Types: | P/E AILC-CNLD-ML-CV-TC; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 925 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 925 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8486 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 4160 ft., Bottom: 8486 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4020 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 660 ft., Bottom: 4140 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4238 ft. | 4450 ft. | | | | SUSSEX | 4758 ft. | 4890 ft. | | | | SHANNON | 5248 ft. | 5320 ft. | | | | NIOBRARA | 7590 ft. | | | | | FORT HAYS | 7901 ft. | | | | | CODELL | 7922 ft. | | | | | J SAND | 8357 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/15/2025 Interval Top: 8370 ft. Interval Bottom: 8392 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/6/2011 | | Treatment Summary: | J S Perf 8370-8392 Holes 56 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,126 gal Slickwater w/ 115,900# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8370 ft. | # Of Holes: | 56 | | Interval Bottom: | 8392 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 5/20/2011 Interval Top: 7696 ft. Interval Bottom: 8392 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/20/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/6/2011 | | Treatment Summary: | NB Perf 7696-7798 Holes 60 Size 0.42
CD Perf 7924-7940 Holes 64 Size 0.42
J S Perf 8370-8392 Holes 56 Size 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1173 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 75 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 44 | | MCF_GAS | 75 |
| | Perforation Data: | | Interval Top: | 7696 ft. | # Of Holes: | 180 | | Interval Bottom: | 8392 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/15/2025 Interval Top: 7696 ft. Interval Bottom: 7940 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/12/2011 | | Treatment Summary: | NB Perf 7696-7798 Holes 60 Size 0.42 CD Perf 7924-7940 Holes 64 Size 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 246,036 gal Slickwater w/ 200,300# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 206,136 gal Slickwater w/ 152,300# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7696 ft. | # Of Holes: | 124 | | Interval Bottom: | 7940 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/15/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|