|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/11/2017 Measured TD: 7898 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/11/2017 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 11/25/2012 | | Proposed Depth/Form: | 7800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 820 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 820 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7800 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 739, Top: , Bottom: 7800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/2/2011 | | Spud Date: | 8/29/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7898 ft. | Measured PB depth: | 7840 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL/CBL, HRI, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 866 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 866 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7887 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 6085 ft., Bottom: 7887 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 6008 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 2106 ft., Bottom: 6050 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 2172 ft., Depth: 6000 ft., Bottom: 6050 ft., Sacks: 480, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6883 ft. | | | | | FORT HAYS | 7162 ft. | | | | | CODELL | 7186 ft. | | | | | GREENHORN | 7280 ft. | | | | | MOWRY | 7621 ft. | | | | | J SAND | 7636 ft. | | | | | DAKOTA | 7843 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/18/2018 Interval Top: 7638 ft. Interval Bottom: 7674 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/10/2011 | Choke Size: | 12.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/2011 | | Treatment Summary: | Frac'd J-Sand w/ 146,011 gals of Slick Water and Silverstim with 281,000#'s of Ottawa sand.
J-Sand producing through 2 composite flow plugs. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/16/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 102 | | BTU_GAS | 1261 | | CALC_BBLS_H2O | 46 | | CALC_BBLS_OIL | 102 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 204 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 55 | | MCF_GAS | 204 |
| | Perforation Data: | | Interval Top: | 7638 ft. | # Of Holes: | 100 | | Interval Bottom: | 7674 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/18/2018 Interval Top: 6958 ft. Interval Bottom: 7201 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/10/2011 | Choke Size: | 12.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/2011 | | Treatment Summary: | Niobrara perfs 6958-7061 (48 holes), Codell perfs 7188-7201 (52 holes).
Frac'd Niobrara and Codell with 273,849 gals of Slick Water, Silverstim, and 15% HCI with 495,000#'s of Ottawa sand.
Codell producing through 2 composite flow plugs.
Commingle Codell and Niobrara. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/16/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 102 | | BTU_GAS | 1261 | | CALC_BBLS_H2O | 46 | | CALC_BBLS_OIL | 102 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 204 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 55 | | MCF_GAS | 204 |
| | Perforation Data: | | Interval Top: | 6958 ft. | # Of Holes: | 100 | | Interval Bottom: | 7201 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/18/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|