|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/17/2025 Measured TD: 7765 ft. Vertical TD: 7343 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/17/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/17/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 65W | Footage: 560 FNL 2120 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 560 FNL 2120 FEL | | Proposed Depth/Form: | 7738 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: , Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7738 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7738 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/2/2011 | | Spud Date: | 5/30/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7765 ft. | Measured PB depth: | 7739 ft. | | True Vertical TD: | 7343 ft. | True Vertical PB depth: | 7317 ft. | | Top PZ Location: | Sec:9 Twp: 2N 65W | Footage: 567 FNL 2093 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 570 FNL 2093 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 739 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 739 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7755 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 555, Top: 4000 ft., Bottom: 7755 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 3977 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 580 ft., Bottom: 4000 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4294 ft. | | | | | SUSSEX | 4658 ft. | | | | | NIOBRARA | 7340 ft. | | | | | FORT HAYS | 7594 ft. | | | | | CODELL | 7616 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 10/17/2025 Interval Top: 7386 ft. Interval Bottom: 7632 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/10/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2011 | | Treatment Summary: | NB PERF 7386-7532 TOTAL 62 SIZE 0.42 CD PERF 7618-7632 TOTAL 56 SIZE 0.44
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 246,793 gal Slickwater w/ 187,200# 40/70, 4,000# SB
Frac Codell down 4-1/2" Csg w/ 206,889 gal Slickwater w/ 150,000# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/11/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 75 | | BTU_GAS | 1337 | | CALC_BBLS_OIL | 75 | | CALC_GOR | 667 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 1430 | | GRAVITY_OIL | 50 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 7386 ft. | # Of Holes: | 118 | | Interval Bottom: | 7632 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/17/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|