Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32587
Well Classification: OW Status: PA - 10/17/2025
Well Name/No:COOK #2-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/17/2025
FacilityID:420466LocationID:420461
County:WELD #123Location:SENW 9 2N65W 6
Field:WATTENBERG - #90750Elevation:4873 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2406FNL  2623 FWLLat/Long: 40.153910 / -104.668924Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153908 / -104.668923Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/15/2011
End Date: 9/15/2011
Reported: 10/25/2011
Prior to rule 205A.b.(2)(A)
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/17/2025             Measured TD: 7765 ft.    Vertical TD: 7343 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/17/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/17/2012
Proposed Top PZ Location:Sec:9 Twp: 2N 65W Footage: 560 FNL  2120 FEL
Bottom Hole Location:Sec:9 Twp: 2N 65W Footage: 560 FNL  2120 FEL
Proposed Depth/Form:7738 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE/4
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 490, Top: , Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7738 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 7738 ft.

Wellbore Completed
Completion Date:6/2/2011
Spud Date:5/30/2011Spud Date Is:ACTUAL
Measured TD:7765 ft.Measured PB depth:7739 ft.
True Vertical TD:7343 ft.True Vertical PB depth:7317 ft.
Top PZ Location:Sec:9 Twp: 2N 65WFootage: 567 FNL  2093 FEL
Bottom Hole Location:Sec:9 Twp: 2N 65WFootage: 570 FNL  2093 FEL
Log Types:PRE FORM 5
Log Types:CD-CN-ML, HRI; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 739 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 739 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7755 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 4000 ft., Bottom: 7755 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 3977 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 580 ft., Bottom: 4000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4294 ft.
SUSSEX4658 ft.
NIOBRARA7340 ft.
FORT HAYS7594 ft.
CODELL7616 ft.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/17/2025                Interval Top: 7386 ft.    Interval Bottom: 7632 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/10/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2011
Treatment Summary:NB PERF 7386-7532 TOTAL 62 SIZE 0.42 CD PERF 7618-7632 TOTAL 56 SIZE 0.44 Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 246,793 gal Slickwater w/ 187,200# 40/70, 4,000# SB Frac Codell down 4-1/2" Csg w/ 206,889 gal Slickwater w/ 150,000# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 75
BTU_GAS 1337
CALC_BBLS_OIL 75
CALC_GOR 667
CALC_MCF_GAS 50
CASING_PRESS 1430
GRAVITY_OIL 50
MCF_GAS 50
Perforation Data:
Interval Top:7386 ft.# Of Holes:118
Interval Bottom:7632 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/17/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No