|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/12/2019 Measured TD: 8212 ft. Vertical TD: 8006 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/12/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/11/2012 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 1980 FNL 1980 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 1980 FNL 1980 FEL | | Proposed Depth/Form: | 8293 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8293 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7241 ft., Bottom: 8293 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/23/2012 | | Spud Date: | 5/15/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8212 ft. | Measured PB depth: | 7980 ft. | | True Vertical TD: | 8006 ft. | True Vertical PB depth: | 7774 ft. | | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 1927 FNL 2020 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 1919 FNL 2033 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7938 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 763, Top: 3090 ft., Bottom: 7938 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 3.875 in., Size: , Top: , Depth: 8212 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4529 ft. | | | | | NIOBRARA | 7494 ft. | | | | | CODELL | 7801 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 11/2/2012 Interval Top: 7801 ft. Interval Bottom: 7815 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/6/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/4/2012 | | Treatment Summary: | Set CIBP @ 7890'. 07-13-12
Frac'd the Codell 7801’ – 7815’, (36 holes) w/ 92,862 gal 22 # PermStim Hybrid cross
linked gel containing 250,109 # 20/40 sand. 07-22-12 | | Total fluid used in treatment (bbls): | 2860 | Max pressure during treatment (psi): | 5498 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 2860 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250190 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7801 ft. | # Of Holes: | 36 | | Interval Bottom: | 7815 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/12/2019 Interval Top: 7577 ft. Interval Bottom: 7815 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/4/2012 | | Treatment Summary: | Set CBP @ 7530'. 08-03-12
Drilled out CBP @ 7530', CFP @ 7680'. 08-04-12 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7786 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/18/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 89 | | BTU_GAS | 1249 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 89 | | CALC_GOR | 4123 | | CALC_MCF_GAS | 367 | | CASING_PRESS | 1135 | | GRAVITY_OIL | 50 | | MCF_GAS | 367 | | TUBING_PRESS | 625 |
| | Perforation Data: | | Interval Top: | 7577 ft. | # Of Holes: | 90 | | Interval Bottom: | 7815 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/2/2012 Interval Top: 7577 ft. Interval Bottom: 7589 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/28/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/4/2012 | | Treatment Summary: | Set CFP @ 7680'. 07-22-12
Frac'd the Niobrara 7577’ – 7589’ (48 holes), w/ 100,884 gals 18 # PermStim Hybrid
cross linked gel containing 249,860# 30/50 sand. 07-22-12 | | Total fluid used in treatment (bbls): | 3324 | Max pressure during treatment (psi): | 5080 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 3324 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 249860 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7577 ft. | # Of Holes: | 48 | | Interval Bottom: | 7589 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/12/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|