Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32541
Well Classification: GW Status: PA - 10/24/2023
Well Name/No:ANDERSON #6-4-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/24/2023
FacilityID:420313LocationID:322691
County:WELD #123Location:NENE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1019FNL  1010 FELLat/Long: 40.099510 / -105.021320Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.099507 / -105.021342Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/22/2012
End Date: 6/22/2012
Reported: 9/6/2012
Days to report: 76
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/7/2023             Measured TD: 8385 ft.    Vertical TD: 8142 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/7/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/11/2012
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 2521 FNL  1422 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68W Footage: 2523 FNL  1436 FEL
Proposed Depth/Form:8393 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 499 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 499 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8393 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7342 ft., Bottom: 8393 ft.

Wellbore Completed
Completion Date:5/28/2012
Spud Date:5/24/2012Spud Date Is:ACTUAL
Measured TD:8385 ft.Measured PB depth:8356 ft.
True Vertical TD:8142 ft.True Vertical PB depth:8113 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 2521 FNL  1422 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68WFootage: 2523 FNL  1436 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 0 ft., Bottom: 839 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8371 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 4328 ft., Bottom: 8371 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4540 ft.
NIOBRARA7536 ft.
CODELL7848 ft.
J SAND8271 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/24/2023                Interval Top: 8284 ft.    Interval Bottom: 8304 ft.

 Completed Information for Formation J SAND
1st Production Date:8/2/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/2/2012
Treatment Summary:Frac'd the J-Sand 8284’-8304’, (40 holes) w/ 62,370 gal PermStim 40# cross linked gel containing 258,820 # 20/40 Sand. 06-22-12
Total fluid used in treatment (bbls):3789Max pressure during treatment (psi):4075
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.56
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3789Disposition method For flowback:DISPOSAL
Total proppant used (lbs):268820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8284 ft.# Of Holes:40
Interval Bottom:8304 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/2/2012                 Interval Top: 7849 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation CODELL
1st Production Date:8/2/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/2/2012
Treatment Summary:Set CFP @ 7920'. 06-22-12 Frac'd the Codell 7,849’ – 7,863’ (42 holes) w/ 88,830 gal PermStim 40# cross linked gel containing 250,970 # 30/50 sand. 06-22-12
Total fluid used in treatment (bbls):2771Max pressure during treatment (psi):4695
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2771Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250970Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7849 ft.# Of Holes:42
Interval Bottom:7863 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/12/2012                 Interval Top: 7617 ft.    Interval Bottom: 8304 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/2/2012Choke Size:0.420 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/12/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7570'. 08-01-12 Drilled out CBP @ 7570', CFP @ 7680', 7920' to commingle the JSND-NBRR-CDL. 08-02-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 160
BTU_GAS 1249
CALC_BBLS_H2O 4
CALC_BBLS_OIL 160
CALC_GOR 4225
CALC_MCF_GAS 676
CASING_PRESS 2177
GRAVITY_OIL 50
MCF_GAS 676
TUBING_PRESS 1427
Perforation Data:
Interval Top:7617 ft.# Of Holes:130
Interval Bottom:8304 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/24/2023                Interval Top: 7617 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/2/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7617 ft.# Of Holes:90
Interval Bottom:7863 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/2/2012                 Interval Top: 7617 ft.    Interval Bottom: 7629 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/1/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/2/2012
Treatment Summary:Set CFP @ 7680'. 06-22-12 Frac'd the Niobrara 7,617’-7,629’ (48 holes), w/ 100,212gals PermStim 40# Hybrid cross linked gel containing 253,380 # 30/50 sand. 06-22-12
Total fluid used in treatment (bbls):3308Max pressure during treatment (psi):4166
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3308Disposition method For flowback:DISPOSAL
Total proppant used (lbs):253380Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7617 ft.# Of Holes:48
Interval Bottom:7629 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/24/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No