Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32494
Well Classification: OW Status: TA - 1/7/2026
Well Name/No:Binder #21-10DU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date1/7/2026
FacilityID:420185LocationID:319109
County:WELD #123Location:SWNW 10 4N67W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1751FNL  386 FWLLat/Long: 40.329440 / -104.885260Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.329420 / -104.885220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 1/7/2026             Measured TD: 7660 ft.    Vertical TD: 7319 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 1/7/2026
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/30/2012
Proposed Top PZ Location:Sec:10 Twp: 4N 67W Footage: 633 FNL  1829 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67W Footage: 627 FNL  1814 FWL
Proposed Depth/Form:7740 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-745 , Unit Acreage: 80, Drill Unit: N2NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7740 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 7740 ft.

Wellbore Completed
Completion Date:1/14/2011
Spud Date:1/9/2011Spud Date Is:ACTUAL
Measured TD:7660 ft.Measured PB depth:7596 ft.
True Vertical TD:7319 ft.True Vertical PB depth:7254 ft.
Top PZ Location:Sec:10 Twp: 4N 67WFootage: 633 FNL  1829 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67WFootage: 627 FNL  1814 FWL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 452 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7638 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 0 ft., Bottom: 7638 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7202 ft.
FORT HAYS7472 ft.
CODELL7493 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/7/2026                  Interval Top: 7495 ft.    Interval Bottom: 7503 ft.

 Completed Information for Formation CODELL
1st Production Date:2/26/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2011
Treatment Summary:Frac'd Codell with 477 bbls of slickwater pad, 143 bbls of 22# pHaser pad, 1934 bbls of 22# pHaser fluid system, 217760# of 20/40 Prefrd Rock and 8000# of SB Excel 20/40 resin coated proppant.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7495 ft.# Of Holes:24
Interval Bottom:7503 ft.Hole Size:0.36 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 1/7/2026                  Interval Top: 7211 ft.    Interval Bottom: 7503 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/26/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 23
BTU_GAS 1303
CALC_BBLS_H2O 13
CALC_BBLS_OIL 23
CALC_GOR 4174
CALC_MCF_GAS 96
CASING_PRESS 787
GRAVITY_OIL 52
MCF_GAS 96
Perforation Data:
Interval Top:7211 ft.# Of Holes:52
Interval Bottom:7503 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/7/2026                  Interval Top: 7211 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/26/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2011
Treatment Summary:Perf'd Niobrara "A" 7211-13' (4 holes), Niobrara "B" 7272-80' (24 holes), Frac'd Niobrara w/ 119 bbl FE-1A Pad, 1548 bbls Slickwater pad, 144 20# bbls of pHaser pad, 2248 bbls 20# pHaser fluid system, 238980# 20/40 Prefrd Rock and 12000# of SB Excel 20/40 resin coated proppant.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7211 ft.# Of Holes:28
Interval Bottom:7280 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA)YLast Production
07/19/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No