|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OBW Status: PA - 7/3/2019 Measured TD: 6954 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OBW PA - 7/3/2019 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 10/30/2012 | | Proposed Depth/Form: | 6878 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: DK-JD , Formation: DAKOTA-J SAND-D SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 560 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: , Bottom: 560 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 6878 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 626, Top: , Bottom: 6878 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/15/2010 | | Spud Date: | 12/3/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 6954 ft. | Measured PB depth: | 6891 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PE TRIP COMBO, CMT VOL, CN/LITH DEN, SCBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 600 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 376, Top: 0 ft., Bottom: 600 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6944 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 565, Top: 2770 ft., Bottom: 6946 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 5815 ft. | | Y | | | NIOBRARA | 5858 ft. | | Y | | | CODELL | 6182 ft. | | Y | | | BENTONITE | 6542 ft. | | Y | | | D SAND | 6645 ft. | | Y | | | J SAND | 6734 ft. | | | | | SKULL CREEK | 6850 ft. | | | |
Formation CODL Formation Classification: OBW Status: AB - 2/27/2019 Interval Top: 6192 ft. Interval Bottom: 6193 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/17/2011 | | Treatment Summary: | 6192'-6193' - DFIT with 18 bbls 2% KCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6192 ft. | # Of Holes: | 4 | | Interval Bottom: | 6193 ft. | Hole Size: | 0.3333333 in. |
|
Formation NBRR Formation Classification: OBW Status: AB - 2/27/2019 Interval Top: 5984 ft. Interval Bottom: 6163 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/14/2011 | | Treatment Summary: | 5984'-5985' - DFIT with 24.7 bbls 2% KCL
6026'-6027' - DFIT with 19 bbls 2% KCL
6118'-6119' - DFIT with 21 bbls 2% KCL
6162'-6163' - DFIT with 16.5 bbls 2% KCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 5984 ft. | # Of Holes: | 16 | | Interval Bottom: | 6163 ft. | Hole Size: | 0.3333333 in. |
|
Formation SHSP Formation Classification: OBW Status: AB - 2/27/2019 Interval Top: 5835 ft. Interval Bottom: 5836 ft.| Completed Information for Formation SHARON SPRINGS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SHARON SPRINGS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2011 | | Treatment Summary: | DFIT with 21.2 bbls 2% KCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SHSP. |
| | Perforation Data: | | Interval Top: | 5835 ft. | # Of Holes: | 4 | | Interval Bottom: | 5836 ft. | Hole Size: | 0.3333333 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/03/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|