|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/13/2019 Measured TD: 8758 ft. Vertical TD: 8494 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/13/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/26/2012 | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1968 FNL 710 FWL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1948 FNL 715 FWL | Proposed Depth/Form: | 8728 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8728 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 7533 ft., Bottom: 8728 ft. |
| | |
Wellbore Completed | Completion Date: | 5/2/2012 | Spud Date: | 4/22/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8758 ft. | Measured PB depth: | 8741 ft. | True Vertical TD: | 8494 ft. | True Vertical PB depth: | 8477 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1968 FNL 710 FWL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1948 N 715 W | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 920 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8743 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 690, Top: 3880 ft., Bottom: 8743 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4909 ft. | | | | NIOBRARA | 7770 ft. | | | | CODELL | 8220 ft. | | | | J SAND | 8649 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/15/2019 Interval Top: 8662 ft. Interval Bottom: 8682 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/5/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/10/2012 | Treatment Summary: | Frac'd the J-Sand 8662’ – 8682’, (40 holes)w/ 74,928 gal 18 # Vistar Hybrid cross
linked gel containing 297,206 # 20/40 Sand. 05-18-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8662 ft. | # Of Holes: | 48 | Interval Bottom: | 8682 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/14/2012 Interval Top: 8221 ft. Interval Bottom: 8235 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/5/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/11/2012 | Treatment Summary: | Set CFP @ 8285'. 05-18-12
Frac'd the Codell 8,221’ – 8,235’ (42 holes) w/ 79,506 gal 22# Vistar Hybrid cross linked
gel containing 250,140 # 30/50 sand. 05-18-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8221 ft. | # Of Holes: | 42 | Interval Bottom: | 8235 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/5/2012 Interval Top: 8081 ft. Interval Bottom: 8682 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 7/5/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/5/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7875'. 06-18-12
Drilled out CBP @ 7875', CFP @ 8143', 8285' to commingle the JSND-NBRR-CDL. 06-19-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8615 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/5/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 32 | BBLS_OIL | 123 | BTU_GAS | 1287 | CALC_BBLS_H2O | 32 | CALC_BBLS_OIL | 123 | CALC_GOR | 2602 | CALC_MCF_GAS | 320 | CASING_PRESS | 1835 | GRAVITY_OIL | 50 | MCF_GAS | 320 | TUBING_PRESS | 909 |
| Perforation Data: | Interval Top: | 8081 ft. | # Of Holes: | 130 | Interval Bottom: | 8682 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/15/2019 Interval Top: 8081 ft. Interval Bottom: 8235 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 7/5/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 8081 ft. | # Of Holes: | 90 | Interval Bottom: | 8235 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/14/2012 Interval Top: 8081 ft. Interval Bottom: 8093 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/30/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/11/2012 | Treatment Summary: | Set CFP @ 8143'. 05-18-12
Frac'd the Niobrara 8,081’ – 8,093’ (48 holes), w/ 43,218 gals 18 # pHaser Hybrid cross
linked gel containing 83,00 # 30/50 sand. 05-19-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 8081 ft. | # Of Holes: | 48 | Interval Bottom: | 8093 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/15/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|