Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32246
Well Classification: OW Status: PA - 6/3/2020
Well Name/No:Heyde #26VD
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/3/2020
FacilityID:419426LocationID:319480
County:WELD #123Location:NENE 26 3N64W 6
Field:WATTENBERG - #90750Elevation:4815 ft.
Planned Location:738FNL  1047 FELLat/Long: 40.201610 / -104.512780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.201610 / -104.512780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/15/2020             Measured TD: 7231 ft.    Vertical TD: 7084 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/15/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/20/2012
Prop Depth/Form:7750 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 670 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 670 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7750 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 7750 ft.

Wellbore Completed
Completion Date:9/1/2011
Spud Date:8/28/2010Spud Date Is:ACTUAL
Measured TD:7231 ft.Measured PB depth:7200 ft.
True Vertical TD:7084 ft.True Vertical PB depth:7053 ft.
Top PZ Location:Sec:26 Twp: 3N 64WFootage: 1361 FNL  103 FELDepth
Bottom Hole Location:Sec:26 Twp: 3N 64WFootage: 1368 FNL  106 FELDepth
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 718 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7218 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 0 ft., Bottom: 7218 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6901 ft.
FORT HAYS7021 ft.
CODELL7045 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 1/10/2012                 Interval Top: 7048 ft.    Interval Bottom: 7056 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/23/2011
Treatment Summary:Frac'd Codell with 476 bbl Slickwater pad, 143 bbl 24# pHaser pad 24# pad, 1984 bbls of 24# pHaser fluid system, 217000# 20/40 Preferred Rock and 8000# of SB Excel 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7048 ft.# Of Holes:24
Interval Bottom:7056 ft.Hole Size:0.421875 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/23/2019                 Interval Top: 6905 ft.    Interval Bottom: 7056 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/7/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 13
BTU_GAS 1378
CALC_BBLS_H2O 3
CALC_BBLS_OIL 13
CALC_GOR 5384
CALC_MCF_GAS 70
CASING_PRESS 754
GRAVITY_OIL 50
MCF_GAS 70
TUBING_PRESS 492
Perforation Data:
Interval Top:6905 ft.# Of Holes:48
Interval Bottom:7056 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 1/10/2012                 Interval Top: 6905 ft.    Interval Bottom: 6913 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2011
Treatment Summary:Perf NBRR "C" 6905-6913 (24 holes) Frac'd Niobrara with 120 bbl FE-1A pad, 1549 bbl Slickwater pad,145 bbl 20# pHaser pad, 2215 bbls pHaser 20# fluid system, 238820# 20/40 Preferred Rock and 12000# 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6905 ft.# Of Holes:24
Interval Bottom:6913 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No