|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2024 Measured TD: 7900 ft. Vertical TD: 7817 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/20/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 1400 FSL 2660 FWL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 1400 FSL 2660 FWL | | Proposed Depth/Form: | 7876 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7876 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 6772 ft., Bottom: 7876 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/24/2012 | | Spud Date: | 1/16/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7900 ft. | Measured PB depth: | 7852 ft. | | True Vertical TD: | 7817 ft. | True Vertical PB depth: | 7769 ft. | | Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 1426 FSL 2630 FWL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 1426 FSL 2630 FWL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 544 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 0 ft., Bottom: 544 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7886 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 623, Top: 3480 ft., Bottom: 7886 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4377 ft. | | | | | NIOBRARA | 6979 ft. | | | | | CODELL | 7286 ft. | | | | | J SAND | 7761 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 6/1/2024 Interval Top: 7780 ft. Interval Bottom: 7824 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/2/2012 | | Treatment Summary: | Frac'd the J-Sand 7780’-7824’, (50 holes) w/ 65,688 gal 18 # pHaser Hybrid cross
linked gel containing 251,420 # 20/40 Sand. 02-02-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7780 ft. | # Of Holes: | 50 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 8/22/2012 Interval Top: 7286 ft. Interval Bottom: 7300 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/2/2012 | | Treatment Summary: | Set CFP @ 7340'. 02-02-12
Frac'd the Codell 7286' - 7300' (42 holes) w/ 91,066 gal 22# pHaser Hybrid cross linked gel
containing 251,420 # 20/40 sand. 02-02-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7286 ft. | # Of Holes: | 42 | | Interval Bottom: | 7300 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 8/22/2012 Interval Top: 6992 ft. Interval Bottom: 7824 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JNBCD. |
| | Perforation Data: | | Interval Top: | 6992 ft. | # Of Holes: | 144 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 6/1/2024 Interval Top: 6992 ft. Interval Bottom: 7824 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/2/2012 | | Treatment Summary: | Set CBP @ 6950'. 02-29-12
Drilled out CBP @ 6950' to commingle the Niobrara-Codell. 03-01-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6956 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/2/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 35 | | BTU_GAS | 1169 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 13571 | | CALC_MCF_GAS | 475 | | CASING_PRESS | 1050 | | MCF_GAS | 475 | | TUBING_PRESS | 795 |
| | Perforation Data: | | Interval Top: | 6992 ft. | # Of Holes: | 144 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 8/22/2012 Interval Top: 6992 ft. Interval Bottom: 7088 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/2/2012 | | Treatment Summary: | Set CFP @ 7138'. 02-02-12
Frac'd the Niobrara 6992– 7088’ (52 holes), w/ 100,800gals 18 # pHaser Hybrid cross
linked gel containing 251,420 # 20/40 sand. 02-02-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6992 ft. | # Of Holes: | 52 | | Interval Bottom: | 7088 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 09/25/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 05/31/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|