|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/28/2024 Measured TD: 8267 ft. Vertical TD: 8135 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/28/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/7/2012 | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 654 FNL 643 FWL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 637 FNL 628 FWL | Proposed Depth/Form: | 8229 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1100 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 470, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8229 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 7128 ft., Bottom: 8229 ft. |
| | |
Wellbore Completed | Completion Date: | 8/18/2011 | Spud Date: | 8/12/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8267 ft. | Measured PB depth: | 8210 ft. | True Vertical TD: | 8135 ft. | True Vertical PB depth: | 8078 ft. | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 654 FNL 643 FWL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 637 N 628 W | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1134 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1134 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8252 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 602, Top: 4320 ft., Bottom: 8252 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4789 ft. | | | | NIOBRARA | 7378 ft. | | | | CODELL | 7666 ft. | | | | J SAND | 8124 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/28/2024 Interval Top: 8124 ft. Interval Bottom: 8170 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/21/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/12/2011 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8124'-8170' (92 HOLES) W/63,588 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,880# 20/40 SAND. 09/12/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8124 ft. | # Of Holes: | 92 | Interval Bottom: | 8170 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 9/24/2024 Interval Top: 7666 ft. Interval Bottom: 7683 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7666 ft. | # Of Holes: | 34 | Interval Bottom: | 7683 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/10/2011 Interval Top: 7588 ft. Interval Bottom: 8170 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/21/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/12/2011 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. SET CBP @ 6580'. 12/02/11. DRILLED OUT CBP @ 6580'. CFP @ 7510', 7710' TO COMMINGLE THE JSND-NBRR-CDL. 12/03/11. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8113 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/10/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 114 | BBLS_OIL | 70 | BTU_GAS | 1 | CALC_BBLS_H2O | 114 | CALC_BBLS_OIL | 70 | CALC_GOR | 4043 | CALC_MCF_GAS | 283 | CASING_PRESS | 1620 | GRAVITY_OIL | 1 | MCF_GAS | 283 | TUBING_PRESS | 420 |
| Perforation Data: | Interval Top: | 7588 ft. | # Of Holes: | 242 | Interval Bottom: | 8170 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2024 Interval Top: 7588 ft. Interval Bottom: 7683 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/12/2011 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7710’. 09/12/2011. FRAC’D THE CODELL 7666’-7683’, (34 HOLES) W/88,662 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,060# 20/40 SAND. 09/12/11 SET CFP @ 7510’. 09/12/11. FRAC’D THE NIOBRARA 7588’-7617’, (116 HOLES) W/100,086 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 253,000# 20/40 SAND. 09/12/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7588 ft. | # Of Holes: | 150 | Interval Bottom: | 7683 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 9/24/2024 Interval Top: 7588 ft. Interval Bottom: 7617 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7588 ft. | # Of Holes: | 116 | Interval Bottom: | 7617 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 08/28/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|