Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32144
Well Classification: GW Status: PA - 10/30/2019
Well Name/No:WILDFLOWER #36-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/30/2019
FacilityID:419122LocationID:323578
Municipality/County:FREDERICK / WELD #123Location:SESW 27 2N68W 6
Field:WATTENBERG - #90750Elevation:5008 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1037FSL  1332 FWLLat/Long: 40.105118 / -104.994050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.105130 / -104.994061Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/7/2011
End Date: 6/7/2011
Reported: 8/10/2011
Prior to rule 205A.b.(2)(A)
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/30/2019             Measured TD: 8520 ft.    Vertical TD: 8254 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/30/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2012
Proposed Top PZ Location:Sec:27 Twp: 2N 68W Footage: 59 FSL  2623 FEL
Bottom Hole Location:Sec:27 Twp: 2N 68W Footage: 56 FSL  2624 FEL
Proposed Depth/Form:8521 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 780 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 780 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8521 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8521 ft.

Wellbore Completed
Completion Date:4/10/2011
Spud Date:4/6/2011Spud Date Is:ACTUAL
Measured TD:8520 ft.Measured PB depth:8477 ft.
True Vertical TD:8254 ft.True Vertical PB depth:8211 ft.
Top PZ Location:Sec:27 Twp: 2N 68WFootage: 59 FSL  2623 FEL
Bottom Hole Location:Sec:27 Twp: 2N 68WFootage: 56 FSL  2624 FEL
Log Types:PRELIMINARY FORM 5
Log Types:SD-DSN-AC-TR; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 815 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 815 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8510 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 7008 ft., Bottom: 8510 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6108 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 637, Top: 348 ft., Bottom: 6130 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4204 ft.
SUSSEX4653 ft.4952 ft.
SHANNON5255 ft.5280 ft.
NIOBRARA7635 ft.
FORT HAYS7905 ft.
CODELL7926 ft.
J SAND8350 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/30/2019                Interval Top: 8352 ft.    Interval Bottom: 8384 ft.

 Completed Information for Formation J SAND
1st Production Date:6/15/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/20/2011
Treatment Summary:J S PERF 8352-8384 HOLES 56 SIZE 0.38 Frac J-Sand down 4-1/2" Csg w/ 148,806 gal Slickwater w/ 115,140# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8352 ft.# Of Holes:56
Interval Bottom:8384 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/16/2011                 Interval Top: 7636 ft.    Interval Bottom: 8384 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/15/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/20/2011
Treatment Summary:NB PERF 7636-7814 HOLES 54 SIZE 0.42 CD PERF 7928-7946 HOLES 54 SIZE 0.42 J S PERF 8352-8384 HOLES 56 SIZE 0.38
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/16/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 40
BTU_GAS 1246
CALC_BBLS_OIL 40
CALC_GOR 2500
CALC_MCF_GAS 100
CASING_PRESS 726
GRAVITY_OIL 50
MCF_GAS 100
Perforation Data:
Interval Top:7636 ft.# Of Holes:164
Interval Bottom:8384 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/30/2019                Interval Top: 7636 ft.    Interval Bottom: 7946 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/15/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/7/2011
Treatment Summary:NB PERF 7636-7814 HOLES 54 SIZE 0.42 CD PERF 7928-7946 HOLES 54 SIZE 0.42 Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 244,652 gal Slickwater w/ 199,380# 40/70, 4,120# SB Excel Frac Codell down 4-1/2" Csg w/ 197,694 gal Slickwater w/ 152,460# 40/70, 4,440# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7636 ft.# Of Holes:108
Interval Bottom:7946 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/30/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No