Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32122
Well Classification: OW Status: PA - 4/5/2022
Well Name/No:Carlson #23-2D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/5/2022
FacilityID:419055LocationID:419058
County:WELD #123Location:NESW 2 6N66W 6
Field:WATTENBERG - #90750Elevation:4860 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2136FSL  2571 FWLLat/Long: 40.516010 / -104.745520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.516030 / -104.745530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/5/2022             Measured TD: 7553 ft.    Vertical TD: 7488 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/5/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/26/2012
Proposed Top PZ Location:Sec:2 Twp: 6N 66W Footage: 1973 FSL  2000 FWL
Bottom Hole Location:Sec:2 Twp: 6N 66W Footage: 1973 FSL  2000 FWL
Proposed Depth/Form:7566 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SW4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: n/a , Unit Acreage: 80, Drill Unit: E/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7566 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 204, Top: 6166 ft., Bottom: 7566 ft.

Wellbore Completed
Completion Date:12/1/2010
Spud Date:11/27/2010Spud Date Is:ACTUAL
Measured TD:7553 ft.Measured PB depth:7469 ft.
True Vertical TD:7488 ft.True Vertical PB depth:7403 ft.
Top PZ Location:Sec:2 Twp: 6N 66WFootage: 1969 FSL  2026 FWL
Bottom Hole Location:Sec:2 Twp: 6N 66WFootage: 1976 FSL  2025 FWL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 684 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 684 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7562 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 200 ft., Bottom: 7562 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX3822 ft.
SHANNON5042 ft.
NIOBRARA7058 ft.
FORT HAYS7360 ft.
CODELL7381 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 6/7/2011                  Interval Top: 7383 ft.    Interval Bottom: 7391 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/5/2011
Treatment Summary:Frac'd Codell with 476 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 1961 bbls of pHaser 22# fluid system, 218920 lbs of 30/50, and 8000 lbs 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7383 ft.# Of Holes:24
Interval Bottom:7391 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/5/2022                  Interval Top: 7064 ft.    Interval Bottom: 7391 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/24/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7367 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 24
BTU_GAS 1285
CALC_BBLS_H2O 4
CALC_BBLS_OIL 24
CALC_GOR 1167
CALC_MCF_GAS 28
CASING_PRESS 823
GRAVITY_OIL 46
MCF_GAS 28
TUBING_PRESS 442
Perforation Data:
Interval Top:7064 ft.# Of Holes:52
Interval Bottom:7391 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 6/7/2011                  Interval Top: 7064 ft.    Interval Bottom: 7208 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/8/2011
Treatment Summary:Perf'd Niobrara "A" 7064-66' (4 holes), Niobrara "B" 7200-08' (24 holes), Frac'd Niobrara with 1547 bbls Slickwater pad, 170 bbls of pHaser 20# pad, 2203 bbls of pHaser 20# fluid system, 241720 lbs of 30'50,12000 lbs 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7064 ft.# Of Holes:28
Interval Bottom:7208 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/05/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No