|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/31/2016 Measured TD: 5296 ft. Vertical TD: 5102 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/31/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/30/2014 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 1870 FSL 2135 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 1930 FSL 2173 FEL | | Proposed Depth/Form: | 5289 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 80, Drill Unit: N/2SE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: N/2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5282 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 605, Top: 268 ft., Bottom: 5282 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/18/2011 | | Spud Date: | 3/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 5296 ft. | Measured PB depth: | 5262 ft. | | True Vertical TD: | 5102 ft. | True Vertical PB depth: | 5068 ft. | | Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 1870 FSL 2135 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 1930 FSL 2173 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL 4-16-11, CBL 7-6-11 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1141 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1141 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5282 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 270 ft., Bottom: 5282 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4461 ft. | | | | | SUSSEX | 4830 ft. | 5098 ft. | | | | PIERRE | 5000 ft. | | | |
Formation PRRE Formation Classification: GW Status: AB - 9/1/2016 Interval Top: 5280 ft. Interval Bottom: 5289 ft.| Completed Information for Formation PIERRE | | 1st Production Date: | 3/8/2013 | Choke Size: | | | Formation Name: | PIERRE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/14/2012 | | Treatment Summary: | DRILLED OUT CIBP TO COMMINGLE PIERRE PRODUCTION WITH SUSSEX PRODUCTION | | Formation Treatment | | Treatment Date: | 5/10/2011 | | Treatment Summary: | Frac Pierre Shale down 4-1/2" Csg w/ 148,180 gal Slickwater w/ 115,450# 40/70, 4,000# SB Excel.
Open hole frac, shoe drilled out, no preplanned. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5274 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/14/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1276 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 1 | | GRAVITY_OIL | 48 | | MCF_GAS | 1 |
| | Perforation Data: | | Interval Top: | 5280 ft. | # Of Holes: | 0 | | Interval Bottom: | 5289 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: AB - 9/1/2016 Interval Top: 4978 ft. Interval Bottom: 5094 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 8/26/2011 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/11/2011 | | Treatment Summary: | Frac Sussex down 4-1/2" Csg w/ 21,056 gal Lightning N2 w/ 181,220# 16/30, 20,100# SB Excel
Producing with rod pump. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5160 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | BTU_GAS | 1126 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 4455 | | CALC_MCF_GAS | 98 | | GRAVITY_OIL | 52 | | MCF_GAS | 98 |
| | Perforation Data: | | Interval Top: | 4978 ft. | # Of Holes: | 52 | | Interval Bottom: | 5094 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/01/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|