|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/27/2017 Measured TD: 7673 ft. Vertical TD: 7633 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/27/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/25/2012 | | Proposed Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 529 FSL 510 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 530 FSL 512 FWL | | Proposed Depth/Form: | 8034 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2SW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8034 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8034 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/4/2010 | | Spud Date: | 10/31/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7673 ft. | Measured PB depth: | 7626 ft. | | True Vertical TD: | 7633 ft. | True Vertical PB depth: | 7586 ft. | | Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 529 FSL 510 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 530 FSL 512 FWL | | Log Types: | Preliminary Form 5 | | Log Types: | CD-CN-ML, DI-GL-GR; XIPE 40 ACL; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 952 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 952 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7663 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1026, Top: 934 ft., Bottom: 7663 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7652 ft., Weight: 9.2 , Citings Type: ACTUAL | | Cement: | Sacks: 93, Top: 414 ft., Bottom: 7652 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4260 ft. | | | | | SUSSEX | 4648 ft. | | | | | NIOBRARA | 7122 ft. | 7673 ft. | | | | FORT HAYS | 7508 ft. | | | | | CODELL | 7531 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 1/2/2018 Interval Top: 7170 ft. Interval Bottom: 7550 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/14/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2011 | | Treatment Summary: | NB PERF 7170-7394 HOLES 80 SIZE 0.24 CD PERF 7532-7550 HOLES 72 SIZE 0.24
Frac Niobrara A & B & C down 3-1/2" Csg w/ 500 gal 15% HCl & 243,054 gal Slickwater w/ 201,241# 40/70, 4,000# SB Excel
Frac Codell down 3-1/2" Csg w/ 204,876 gal Slickwater w/ 151,660# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 60 | | BTU_GAS | 1286 | | CALC_BBLS_OIL | 60 | | CALC_GOR | 1667 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 51 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7170 ft. | # Of Holes: | 152 | | Interval Bottom: | 7550 ft. | Hole Size: | 0.24 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|