|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/7/2018 Measured TD: 7610 ft. Vertical TD: 7309 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/7/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/19/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 5N 66W | Footage: 2800 FNL 1320 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 66W | Footage: 2800 FNL 1320 FWL | | Proposed Depth/Form: | 7595 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7595 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 5 ft., Bottom: 7595 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/17/2010 | | Spud Date: | 12/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7610 ft. | Measured PB depth: | 7564 ft. | | True Vertical TD: | 7309 ft. | True Vertical PB depth: | 7263 ft. | | Top PZ Location: | Sec:5 Twp: 5N 66W | Footage: 2781 FNL 1156 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 66W | Footage: 2780 FNL 1320 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 818 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 818 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7599 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 420 ft., Bottom: 7599 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3712 ft. | | | | | SUSSEX | 4297 ft. | | | | | NIOBRARA | 7134 ft. | | | | | FORT HAYS | 7402 ft. | | | | | CODELL | 7424 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 6/7/2018 Interval Top: 7152 ft. Interval Bottom: 7444 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/5/2011 | | Treatment Summary: | NB Perf 7152-7336 Holes 66 Size 0.42 CD Perf 7426-7444 Holes 54 Size 0.40
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 249,799 gal Slickwater w/ 50,120# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 191,577 gal Slickwater w/ 38,360# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 106 | | BTU_GAS | 1285 | | CALC_BBLS_OIL | 106 | | CALC_GOR | 5368 | | CALC_MCF_GAS | 569 | | CASING_PRESS | 1320 | | GRAVITY_OIL | 54 | | MCF_GAS | 569 |
| | Perforation Data: | | Interval Top: | 7152 ft. | # Of Holes: | 120 | | Interval Bottom: | 7444 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/07/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|